Central electricity authority Annual Report 2009-10<br />
Status of Ongoing Projects under National Perspective Plan<br />
on R&D for Power Sector<br />
No Title of the Project Project<br />
Implementing<br />
organization<br />
Project Funding<br />
Sources<br />
(Rs. Lakh)<br />
(a) R&D ProjTects initiated During 10 th Plan Period:<br />
1. Development of Silt Erosion Resistant Material for Turbines of<br />
Hydro generators<br />
NML Jamshedpur NHPC: Rs. 100.00<br />
SJVNL: Rs. 50.00<br />
MoP : Rs. 149.79<br />
Total Rs. 299.79<br />
2. National Effort to develop<br />
Technology for Custom Power<br />
Devices(STATCOM)<br />
3. Development of Superconducting<br />
Transformers<br />
(i) 4 x 500 kVA<br />
by C-DAC for<br />
IT-Park.<br />
(ii) 2.5 MVAr by<br />
BHEL for<br />
Bhilai Steel<br />
Plant.<br />
C-DAC Rs.125.0<br />
MoP Rs. 125.0<br />
BHEL Rs. 192.5<br />
MoP Rs. 192.5<br />
Total Rs. 635.0<br />
EMCO, Mumbai MoP Rs. 100.0<br />
EMCO Rs. 100.0<br />
Total Rs. 200.0<br />
Funds Released to<br />
lead agencies<br />
(Rs. Lakh)<br />
NHPC share:<br />
Rs 45.0 lakh<br />
SJVNL share:<br />
Rs 20.0 lakh<br />
MoP share:<br />
Rs 149.0 lakh<br />
Total: Rs 214 lakh<br />
(i) MoP Share:<br />
Rs 120.0 lakh<br />
(ii) MoP share:<br />
Rs 162.75 lakh<br />
MoP share:<br />
Rs 74.25 lakh<br />
Status of the project<br />
Annexure-2A<br />
(Item No.2.8.1)<br />
• Slurry erosive Wear studies for benchmarking of<br />
13Cr-4Ni steel have been completed.<br />
• Flow modeling through CFD analysis has been<br />
initiated<br />
• Weldability testing machines are being procured<br />
(i)<br />
(ii)<br />
(1/2)<br />
• For Simulation Studies to validate the algorithm<br />
for compensation of neutral current unbalanced<br />
current, reactive <strong>power</strong> and harmonics have<br />
been completed.<br />
• Design and testing of <strong>power</strong> and control<br />
module of lab prototype for converter, inverter<br />
and STATCOM mode has been completed<br />
• Modeling of arc furnace for flicker generation<br />
has been completed.<br />
• Design of <strong>power</strong> circuits, control circuits and<br />
DSP based control S/W is in progress<br />
• Assembly of IGBT <strong>power</strong> stack is in<br />
progress<br />
• Design of 630 kVA HTS transformer for<br />
distribution system is completed.<br />
• Three HV and three LV formers has been<br />
developed.<br />
• HV and LV copper terminations fabricated.<br />
• Copper shield Heat Exchanger has been<br />
developed.<br />
• Testing of 3 prototype cryostat with new resin is<br />
underway.<br />
136<br />
"Energy Saved is Energy Generated"