Central electricity authority Annual Report 2009-10<br />
Annexure-8B<br />
(Item No.8.8.1)<br />
List of Projects for which Detail Design & Engineering<br />
Services were provided during 2009-10<br />
Sl. No.<br />
Name of Project & Scope of<br />
Consultancy Services<br />
1. Transmission Project under<br />
Prime Minister’s Reconstruction<br />
Programme in J&K :<br />
Consultancy Services to Power<br />
Development Department., Govt. of<br />
J&K:<br />
2. Raghunathpur TPS, Phase-I, DVC<br />
( 2 x 600 MW ), Purulia, W.B.<br />
Works carried out/in progress<br />
• Checking of Design & drawing of various civil works of<br />
different substations & grid stations ( eg. control room<br />
building, pile foundation, isolator foundation, equipment<br />
foundation, transformer foundation, gantry tower foundation,<br />
cable trench, fencing, retaining walls, roads, drains,<br />
switchyard, mesh fence, water sump etc.)<br />
- Lissar, Bandipora & Shopian Bhalessa, Chandak<br />
- Kishtwar Ramban . Budgam Bishnah<br />
- Amargarh & Alustang, Mir bazaar, Battal Manwal<br />
- Siot<br />
• Checking of design & drawing of tower foundations for<br />
construction of Transmission Lines:<br />
- 132 kV D/C Barn-Siot –Kalakote T. Line<br />
- 132 kV Ramban- Khellani- Kishtwar T. Line<br />
- Hiranagar- Barn<br />
- Lassipora-Shopian<br />
- Bandipora- Badampora<br />
Design review meeting between DVC, R Infra, TCE, CEA and<br />
TPSC office Hyderabad for structural works of RTPS, Phase-I<br />
was attended by P. Vasishth, Dy. Director. Meeting for discussion<br />
regarding provision of stiffeners in plated girder for TG building<br />
and bunker building between DVC, R Infra& TCE & CEA was<br />
attended by Shri C.L.L. Das & P. Vasishth, Dy. Director. Comments<br />
on Quality Assured Plan (QAP) for fabrication of structural steel<br />
work of <strong>power</strong> house and mill bunker building was sent.<br />
184<br />
"Energy Saved is Energy Generated"