Central electricity authority Annual Report 2009-10<br />
94<br />
Hydro Power Plants and connectivity of<br />
solar roof top systems with grid.<br />
iv. Examination of causes of failure of sickle<br />
plates of penstocks of Srisailem Left Bank<br />
HEP & remedial measures.<br />
v. Scrutiny of draft Standards as received from<br />
BIS from time to time.<br />
8.7 Design and Engineering of Thermal<br />
Projects<br />
The following design & engineering<br />
assignments as a part of consultancy work were<br />
carried out:<br />
a) Review consultancy for Yamunanagar<br />
Thermal Power Project (2x300 MW)<br />
b) Review consultancy for Hisar Thermal<br />
Power Project (2x600 MW)<br />
c) Review consultancy for Raghunathpur TPP<br />
(2x600 MW).<br />
8.8 Design & Consultancy Assignments<br />
(Civil aspects) for Thermal/ Hydro/<br />
Power Transmission Projects<br />
CEA is providing consultancy services for<br />
Thermal Power Projects / Power Transmission<br />
Schemes. The civil aspects of cost estimates for<br />
stage-I and stage-II activities of Hydro<strong>power</strong><br />
Projects under three-stage clearance of H.E.<br />
Projects are also being examined. The monitoring<br />
of Fly Ash Generation and Utilization at Thermal<br />
Power Stations pertaining to Power Utilities in<br />
various States is being carried out. Assistance<br />
on civil engineering matters to various Wings/<br />
Divisions of CEA / MoP is also provided,<br />
whenever required. The main works carried out<br />
during the stated period are given as under:<br />
8.8.1 Design and Consultancy Assignments<br />
(civil aspects) for Thermal/Power<br />
Transmission Projects<br />
1) Consultancy services to Power Development<br />
Department, Govt. of J&K in respect of<br />
Transmission Project under Prime Minister’s<br />
Reconstruction Programme.<br />
2) Review Consultancy Services to DVC,<br />
Kolkata for Raghunathpur Thermal Power<br />
Station.<br />
3) Technical works in respect of other Thermal<br />
Power Plants viz. Yamuna Nagar TPS, RG<br />
TPP Hissar, Suratgarh TPP under Rajasthan<br />
Vidhyut Utpadan Nigam Ltd.<br />
The details of works carried out during<br />
the year are given at Annexure-8B.<br />
8.8.2 Assignment pertaining to Civil<br />
Works of Hydro-electric Projects<br />
CEA is providing following necessary<br />
assistance for civil works pertaining to H.E.<br />
Projects being referred to it.<br />
1) Preliminary comments on DPR of<br />
H.E. Projects.<br />
2) Checking and finalization of Quantities of<br />
Civil Works for DPR of H.E. Projects.<br />
3) Checking / finalization of phasing of Cost<br />
of Civil Works for DPR of H.E. Projects.<br />
4) Finalization of Cost Estimate for Stage-II<br />
activities of H.E. Projects.<br />
Details of the above works are at<br />
Annexure-8C.<br />
8.8.3 Consultancy and Technical Support<br />
a) The Technical Specifications for<br />
Remote Terminal Unit (RTU) and PLC<br />
Communication system for existing and new<br />
132kV and 220kV <strong>power</strong> line networks in<br />
Jammu & Kashmir Region were prepared by<br />
CEA and forwarded to Power Development<br />
Department (PDD), Government of J&K.<br />
Technical Bid Evaluation in respect of<br />
Kashmir Region has been completed and<br />
award may be placed shortly. In regard<br />
to Jammu Region, technical clarification<br />
sought by Bidders is being processed.<br />
b) A request for taking technical consultancy<br />
services of CEA has been made by Energy<br />
“Energy Saved is Energy Generated”