Central electricity authority Annual Report 2009-10<br />

CHAPTER – 2<br />

PLANNING FOR POWER DEVELOPMENT<br />

2. Power Planning<br />

2.1.1 Generation Planning Studies<br />

i) Generation Planning Studies have been<br />

carried out for the terminal year of 12 th<br />

Plan and 13 th Plan for preparation of Draft<br />

National Electricity Plan.<br />

ii) Power absorption studies for accord of<br />

concurrence to the following projects have<br />

been carried out:<br />

1. Indira Sagar (Polavaram) HEP<br />

(12x80=960 MW) in Andhra Pradesh<br />

by M/s APGENCO.<br />

2. Dibbin HEP (2x60 MW) in Arunachal<br />

Pradesh by KSK Dibbin Hydro Power<br />

Pvt. Ltd.<br />

3. Nafra Hydro Electric Project<br />

(2x48 MW) in Arunachal Pradesh by<br />

Sew Nafra Power Corporation Private<br />

Limited.<br />

4. Demwe Lower HEP (1750 MW) in<br />

Arunachal Pradesh by Athena Demwe<br />

Power Pvt. Ltd.<br />

5. Bajoli Holi HEP (160 MW) in Arunachal<br />

Pradesh by M/s GMR.<br />

6. Lower Siang HEP (9x300=2700 MW)<br />

in Arunachal Pradesh by M/s Jaypee<br />

Arunachal Power Ltd.<br />

7. Sainj HEP (2x50=100 MW) in<br />

Himachal Pradesh by Himachal Power<br />

Corporation Ltd.<br />

8. Kutehr HEP (3x80=240 MW) in<br />

Himachal Pradesh by JSW Energy Ltd.<br />

9. Tato-II HEP (4x175 MW) in Arunachal<br />

Pradesh by Tato Hydro Power Pvt Ltd.<br />

10. Nyamjang Chhu HEP (6x150 MW) in<br />

Arunachal Pradesh by Bhilwara Energy<br />

Ltd.<br />

11. Teesta-IV HEP (4x130 MW) in Sikkim<br />

by M/s NHPC Ltd.<br />

2.1.2 Reports brought out<br />

1) Guidelines for 'Qualifying Requirements of<br />

the Bidders for Balance of Plants (BoP) of<br />

Coal/Lignite based <strong>thermal</strong> <strong>power</strong> projects'<br />

were revised and circulated to all PSUs<br />

and State Utilities in November, 2009.<br />

Later on, some comments/ observations<br />

were received from the EPC contractors,<br />

engineering and manufacturing firms, State<br />

utilities and joint venture companies. Based<br />

on these feedbacks, some amendments were<br />

proposed in the Qualifying Requirements<br />

of bidders and same were discussed in the<br />

meeting held in CEA by CEA Committee<br />

[comprising of CE(IRP) and CE(TE&TD)<br />

as members] on 11/01/2010 and decisions<br />

were taken regarding the amendments. These<br />

modifications would shortly be carried out<br />

in the Guidelines.<br />

2) Draft National Electricity Plan covering<br />

review of 11 th Plan & 12 th Plan in detail and<br />

perspective 13 th Plan is under preparation.<br />

The draft Plan will be circulated to all<br />

stakeholders for suggestions / comments<br />

and the same would be incorporated<br />

suitably in the final Plan. The Plan will be<br />

thereafter notified in the Gazette of India<br />

after approval by Government, as per the<br />

Electricity Act, 2003.<br />

2.2 Participation of CEA as Committee<br />

Member / Interaction Meets etc.<br />

1) Officers from CEA participated in the<br />

Interactive Session on 'Issues in Tapping<br />

of Surplus Power from the Captive/<br />

Cogeneration Power Plants' held at Pune on<br />

11/09/2009 in which representatives from<br />

"Electricity is life: Conserve it."<br />

17