Central electricity authority Annual Report 2009-10<br />
1.15 Monthly Reports<br />
CEA receives regular data on almost all<br />
the areas of Power Sector, such as generation,<br />
transmission and distribution of <strong>power</strong>. The<br />
information received is incorporated in the<br />
following regular monthly reports:<br />
‣ Report on important <strong>development</strong>s during<br />
the month for Prime Minister’s Office<br />
‣ Summary report for Council of Ministers<br />
on important <strong>development</strong>s in Power Sector<br />
during the month.<br />
‣ Executive Summary<br />
‣ Thrust area report for P.M.O.<br />
‣ Fortnightly Report for P.M.O.<br />
The first two reports are issued by 1 st and<br />
5 th of every month briefly highlighting the major<br />
achievements/milestones/critical issues in Power<br />
Sector.<br />
The Executive Summary is issued<br />
by 10 th of every month and is an important<br />
reference document reflecting targets vis-àvis<br />
achievements in almost all the important<br />
areas of Power Sector in the month of review.<br />
Executive Summary of the important activities<br />
in the Power Sector and the energy generation<br />
parameters for the review and information is<br />
sent to Hon’ble Minister of Power and other<br />
concerned officials. The report contains the<br />
details of the <strong>thermal</strong> and hydro generating<br />
units commissioned during the month and<br />
the progress of major transmission lines<br />
& sub-stations commissioned. The status<br />
of generation vis-à-vis the programme and<br />
also the performance with reference to the<br />
corresponding period of previous years and the<br />
status of the coal position of various <strong>thermal</strong><br />
<strong>power</strong> stations is highlighted.<br />
The up-to-date details of the generating<br />
capacity, energy demand and the demand met in<br />
various States and the Regions are brought out<br />
for overall review of the <strong>power</strong> situation in the<br />
country. Also, information regarding capacity<br />
addition, generation targets/achievements etc.<br />
are sent to MoP every month for Press Release<br />
by the end of 2 nd week.<br />
1.15.1 Information on various issues<br />
provided to the Ministry of Power<br />
1. Material for Economic Survey 2009-10<br />
2. Material for IITF 2009<br />
3. ADB Energy Policy 2009-10<br />
4. Annual Report 2009-10 of MoP<br />
5. Major Achievements in Power Sector<br />
6. National Electricity Policy<br />
7. Estimates Committee<br />
8. Performance review of Power Sector<br />
9. Power Ministers’ Conference<br />
10. Material for various speeches for use by<br />
MoS (Power).<br />
1.16 Computerization in CEA<br />
The use of computers for <strong>power</strong> sector<br />
<strong>development</strong> was started in CEA in mid sixties.<br />
In the initial years, the usage was mainly for<br />
<strong>power</strong> system planning studies. However,<br />
over the years computerization has pervaded<br />
all activities of CEA. A number of software<br />
packages have been procured (refer Software<br />
facilities) and in-house expertise developed. The<br />
hardware facilities have also been enhanced.<br />
All the technical Divisions and the<br />
administrative sections have been provided with<br />
computers to facilitate computerization of all<br />
the works in CEA. All the desktop computers<br />
of CEA office at Sewa Bhawan and West Block-<br />
II have been interconnected through wired as<br />
well as wireless LAN. The important statistics<br />
/ data / information of CEA is uplinked on<br />
the website of Central Electricity Authority<br />
(www.cea.nic.in) for global access. The bilingual<br />
"Energy Saved is Energy Generated"<br />