Central electricity authority Annual Report 2009-10<br />

CAPTER – 7<br />

DISTRIBUTION AND RURAL ELECTRIFICATION<br />

7.1 Restructured Accelerated Power<br />

Development Reforms Programme<br />

(R-APDRP) during 11 th Plan period<br />

After the comprehensive evaluation of<br />

the APDRP programme, which was short closed<br />

in Feb. 2009, Ministry of Power approved the<br />

Restuctured Accelerated Power Development<br />

and Reforms Programme (R-APDRP) during<br />

the 11 th Five Year Plan with revised terms and<br />

conditions as a Central Sector Scheme. The<br />

focus of Restructured APDRP (R-APDRP) in<br />

11 th Plan and beyond is on actual, demonstrable<br />

performance in terms of loss reduction. State<br />

Power Utilities are expected to reduce AT&C<br />

losses to 15%. The Utilities are also expected<br />

to achieve the following target of AT&C loss<br />

reduction for the utility as a whole:<br />

• Utilities having AT&C loss above 30%:<br />

Reduction by 3% per year<br />

• Utilities having AT&C loss below 30%:<br />

Reduction by 1.5% per year<br />

The expected programme size of<br />

Re-structured APDRP during 11 th Plan is<br />

Rs. 51,577 crore. It is proposed to cover urban<br />

areas – towns and cities with population of<br />

more than 30,000 (10,000 in case of special<br />

category States). In addition, in certain highload<br />

density rural areas with significant loads,<br />

works of separation of agricultural feeders<br />

from domestic and industrial ones and of High<br />

Voltage Distribution System (11 kV) will also<br />

be taken up.<br />

Projects under the scheme are proposed to<br />

be taken up in two Parts. Part-A is proposed to<br />

include the projects for establishment of baseline<br />

data and IT applications for energy accounting /<br />

auditing & IT based consumer service centers.<br />

Part-B shall include regular distribution<br />

strengthening projects.<br />

Expected investment in Part-A (Baseline<br />

System) shall be Rs. 10,000 crores and that in<br />

Part-B shall be Rs. 40,000 crores.<br />

Initially, funds for the projects under both<br />

the parts will be provided through loan (100% for<br />

Part-A and 25% for Part-B), balance to be raised<br />

by State utilities through Financial Institutions,<br />

except special category and North-eastern<br />

States for which under Part-B, 90% loan will be<br />

provided which will be converted into grant on<br />

fulfillment of conversion conditionalities.<br />

PFC is acting as a single window service<br />

and coordinating with agencies involved such<br />

as MoP, APDRP Steering Committee, CEA,<br />

Electricity Distribution Utilities, Implementing<br />

Agencies and various Consultants for speedy<br />

and timely completion of projects under the Restructured<br />

APDRP and thus assist the Distribution<br />

Utilities in achieving loss reduction targets.<br />

As on 31 st March 2010, under Part A,<br />

projects for 1380 towns for 44 Discoms of<br />

26 States at an estimated cost of Rs.5030.28<br />

crores have been sanctioned and an amount of<br />

Rs1334.76 crores has been disbursed so far.<br />

CEA is member of the various committees<br />

constituted by MoP for implementation of Part-A<br />

and Part-B of R-APDRP.<br />

7.2 Status of Metering<br />

A Committee was constituted on the<br />

recommendation of Working Group on<br />

“Metering Issues” constituted by Forum of<br />

Regulators to bring out common standard<br />

for kVAh metering in respect of all high- end<br />

consumers for connected load of 20 KW and<br />

“Electricity is life: Conserve it.”<br />

83