Central electricity authority Annual Report 2009-10<br />

Hydro generating companies were also trained<br />

to furnish data regarding project investigation,<br />

project appraisal, construction monitoring,<br />

R&M, etc. However, the process of collection of<br />

data (other than daily data) from the aforesaid<br />

utilities in online mode is under testing and yet<br />

to stabilise.<br />

The study by the consultant to recommend<br />

further upgradation of IT facilities in CEA in<br />

Phase-II has also been initiated with the approval<br />

of MoP with the following broad objectives:<br />

• To provide adequate redundancy in the<br />

existing data centre to enhance reliability of<br />

the system and to build a separate disaster<br />

recovery data centre.<br />

• More intensive and comprehensive IT<br />

based monitoring of execution of <strong>power</strong><br />

projects.<br />

1.17 ISO 9001:2000 Quality System<br />

certification for CEA<br />

In order to improve the quality of output<br />

and competency of the personnel of CEA, the<br />

Quality Management System (QMS) as per<br />

ISO 9001:2000 was adopted by CEA. Though<br />

ISO certification for all the wings of CEA was<br />

obtained from BIS during February-March 2004,<br />

a single Composite Licence was obtained from<br />

BIS in 2007.<br />

On renewal audit by BIS, CEA obtained<br />

ISO 9001:2008 certification in February<br />

2010. As per the provisions of ISO 9001:2008<br />

prescribed in the Quality Manual, Monthly,<br />

Quarterly and Half Yearly Review Meetings<br />

are held in various divisions/wings at the level<br />

of Chief Engineers, Members and Chairperson<br />

(CEA). The BIS conducts Surveillance Audit<br />

once in a year for all the wings for continuance<br />

of ISO certification.<br />

1.18 Various Committees constituted by<br />

CEA<br />

The following committees/ working<br />

groups, comprising of CEA officers & others,<br />

were constituted by CEA:<br />

Sl.<br />

No.<br />

Date of<br />

constitution of<br />

Committee<br />

Name of the Committee<br />

1 06.05.2009 Committee to inquire into the Grid Disturbance in the CESC system on 19 th<br />

April, 2009.<br />

2 08.01.2010 Committee to inquire into the partial Grid Disturbance that occurred in Northern<br />

Region on 2 nd January, 2010.<br />

3 11.01.2010 Committee of Experts for the preparation of a document entitled "Standard Design<br />

Criteria / Guidelines-765/220 kV Switchyard for Thermal Power Stations (2x500<br />

MW or above)."<br />

4 19.02.2010 Committee for 18 th Electric Power Survey<br />

*****<br />

16<br />

"Energy Saved is Energy Generated"