Central electricity authority Annual Report 2009-10<br />
Hydro generating companies were also trained<br />
to furnish data regarding project investigation,<br />
project appraisal, construction monitoring,<br />
R&M, etc. However, the process of collection of<br />
data (other than daily data) from the aforesaid<br />
utilities in online mode is under testing and yet<br />
to stabilise.<br />
The study by the consultant to recommend<br />
further upgradation of IT facilities in CEA in<br />
Phase-II has also been initiated with the approval<br />
of MoP with the following broad objectives:<br />
• To provide adequate redundancy in the<br />
existing data centre to enhance reliability of<br />
the system and to build a separate disaster<br />
recovery data centre.<br />
• More intensive and comprehensive IT<br />
based monitoring of execution of <strong>power</strong><br />
projects.<br />
1.17 ISO 9001:2000 Quality System<br />
certification for CEA<br />
In order to improve the quality of output<br />
and competency of the personnel of CEA, the<br />
Quality Management System (QMS) as per<br />
ISO 9001:2000 was adopted by CEA. Though<br />
ISO certification for all the wings of CEA was<br />
obtained from BIS during February-March 2004,<br />
a single Composite Licence was obtained from<br />
BIS in 2007.<br />
On renewal audit by BIS, CEA obtained<br />
ISO 9001:2008 certification in February<br />
2010. As per the provisions of ISO 9001:2008<br />
prescribed in the Quality Manual, Monthly,<br />
Quarterly and Half Yearly Review Meetings<br />
are held in various divisions/wings at the level<br />
of Chief Engineers, Members and Chairperson<br />
(CEA). The BIS conducts Surveillance Audit<br />
once in a year for all the wings for continuance<br />
of ISO certification.<br />
1.18 Various Committees constituted by<br />
CEA<br />
The following committees/ working<br />
groups, comprising of CEA officers & others,<br />
were constituted by CEA:<br />
Sl.<br />
No.<br />
Date of<br />
constitution of<br />
Committee<br />
Name of the Committee<br />
1 06.05.2009 Committee to inquire into the Grid Disturbance in the CESC system on 19 th<br />
April, 2009.<br />
2 08.01.2010 Committee to inquire into the partial Grid Disturbance that occurred in Northern<br />
Region on 2 nd January, 2010.<br />
3 11.01.2010 Committee of Experts for the preparation of a document entitled "Standard Design<br />
Criteria / Guidelines-765/220 kV Switchyard for Thermal Power Stations (2x500<br />
MW or above)."<br />
4 19.02.2010 Committee for 18 th Electric Power Survey<br />
*****<br />