27.07.2014 Views

thermal power development - Infraline

thermal power development - Infraline

thermal power development - Infraline

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Central electricity authority Annual Report 2009-10<br />

Sl.<br />

No.<br />

ANNEXURE-9A<br />

(Item-9.1.4)<br />

OUTSTANDING DUES PAYABLE TO CENTRAL PUBLIC SECTOR UNDERTAKINGS<br />

(CPSUs)-CUMULATIVE AMOUNT<br />

( in Rs. Crores)<br />

Name of state/SEB/<br />

Utility<br />

NTPC NHPC PGCIL NEEPCO NPCIL DVC NLC SJVNL BBMB THDC NHDC TOTAL<br />

(1/2)<br />

1. Andhra Pradesh -0.56 80.36 79.80<br />

2. Arunachal Pradesh 3.66 3.66<br />

3. Assam 63.36 63.36<br />

4. Bihar 18.28 3.73 22.01<br />

5. Gujarat 1.07 1.07<br />

6. Goa -0.02 -0.02<br />

7. HVPNL(HSRB) 0.06 0.71 0.77<br />

8. HImachal Pradesh 0.37 -1.24 0.40 0.14 -0.33<br />

9. Jammu & Kashmir 75.83 10.71 6.80 6.22 99.56<br />

10. Karnataka(KPTCL) 19.42 176.46 195.88<br />

11. Kerala 0.02 43.32 43.34<br />

12. Madhya Pradesh -0.95 -0.95<br />

13. Maharashtra -0.80 -0.80<br />

14. Manipur 3.68 3.68<br />

15. Meghalaya 48.00 48.00<br />

16. Mizoram 4.13 4.13<br />

17. Nagaland 10.22 10.22<br />

18. Punjab 6.75 6.75<br />

19. Rajasthan 1.11 12.87 38.37 52.35<br />

186<br />

"CEA-Helping the Transformation of Indian Power Sector"

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!