Central electricity authority Annual Report 2009-10<br />

Cost Estimates for augmentation of 66 kV<br />

S/C line from Kharadpada to Rakholi to<br />

D/C line were technically examined.<br />

3. Proposal for award of works for<br />

augmentation of 220/66 kV Khardapada S/S<br />

from 3x100 MVA to 4x100 MVA capacity<br />

was examined.<br />

4. Technical bids for procurement of<br />

Comprehensive Power Distribution Network<br />

Planning & Management Software for UT<br />

of D&NH were examined.<br />

7.7.4 Daman & Diu<br />

1. The schemes for establishment of new 66/11<br />

kV, 2x15 MVA S/S at Bhimpora and normal<br />

<strong>development</strong> works during 2009-10 in UT<br />

of Daman & Diu were accorded technical<br />

clearance.<br />

2. Technical bids for procurement of<br />

Comprehensive Power Distribution Network<br />

Planning & Management Software for UT<br />

of Daman was technically examined.<br />

3. Technical Specifications for the scheme for<br />

establishment of 66/11 kV, 2x15 MVA S/S<br />

at Bhimpora were examined.<br />

4. Scheme for installation of pre-paid meters<br />

in UT of Daman & Diu was technically<br />

examined.<br />

5. Technical bids for supply, erection, testing<br />

and commissioning of 66 kV bays at<br />

Verkund, Dalwada and Ringanwada S/Ss<br />

were examined.<br />

7.7.5 Delhi/ NDMC / NCRPB<br />

(a) Works related to New Delhi Municipal<br />

Committee (NDMC)<br />

Chief Engineer (DPD), CEA took a<br />

meeting for reviewing <strong>power</strong> supply in NDMC<br />

area during the Commonwealth Games, 2010.<br />

Proposal for inclusion of new works in 11 th<br />

Plan scheme of NDMC and report on Electricity<br />

Distribution Reforms in NDMC areas were<br />

examined.<br />

(b) National Capital Region Planning Board<br />

(NCRPB)<br />

1. Rendering assistance to National Capital<br />

Region Planning Board (NCRPB) for<br />

preparation of Functional Plan for Power<br />

2021 for National Capital Region.<br />

2. Matter regarding creation of separate<br />

Discoms for the NCR areas in the States<br />

of UP, Haryana & Rajasthan was examined<br />

and comments were sent to NCRPB.<br />

7.7.6 Other works<br />

• Examination of the Scheme for<br />

Transmission & Distribution works in the<br />

State of Himachal Pradesh to be executed<br />

by HPPTCL through Multi-Lateral Funding<br />

Agency.<br />

• Conduction of Mock Test exercise at CPWD<br />

11 kV Parliament House S/S to test the<br />

reliability of <strong>power</strong> supply to Parliament<br />

House before commencement of each<br />

Parliament Session.<br />

• A presentation was made in the International<br />

Conclave on key inputs for 12 th Plan and<br />

beyond. Recommendations on Distribution<br />

Sector, as discussed in International<br />

Conclave on key inputs for 12 th Plan and<br />

beyond held on 18 th & 19 th August, 2009,<br />

were also prepared.<br />

• Preparation of material on Distribution<br />

Sector for Mid-Term Appraisal of 11 th Plan<br />

period was also undertaken.<br />

• Examination of the R&D projects on<br />

Distribution Sector during 11 th Plan period<br />

was done.<br />

86<br />