Central electricity authority Annual Report 2009-10<br />

5.14 Achievement during the year<br />

2009-10<br />

The following eight schemes (one from<br />

Central Sector & seven from State Sector)<br />

having an aggregate installed capacity of about<br />

2350 MW (installed capacity of Dehar Ph. B not<br />

included in the total as it has been accounted<br />

for in the other scheme namely Dehar Ph. A of<br />

same station) have been completed during the<br />

year 2009-10 at an actual cost of Rs. 59 Crores<br />

and accrued benefits of 330 MW through life<br />

extension.<br />

Sl. No. Name of Scheme Installed Capacity (MW) Agency<br />

1. Dehar Ph-B 6x165 BBMB<br />

2. Nagjhari, U1 to U6 3x150 + 3x135 KPCL<br />

3. Sharavathy Ph.B 10x103.5 KPCL<br />

4. Supa 2x50 KPCL<br />

5. Bhadra 2x12 KPCL<br />

6. Upper Sileru 4x60 APGENCO<br />

7. Vaitarna 1x60 MSPGCL<br />

8. Koyna Dam 2x18 MSPGCL<br />

5.15 Miscellaneous works undertaken/<br />

completed<br />

i) Inquiry Committee for Accident at<br />

Sabirigiri HEP (Kerala)<br />

An Inquiry Committee was constituted<br />

under the chairmanship of Chief Engineer<br />

(HE&RM) to find the causes of accident and<br />

Renovation & Modernization (R&M) works<br />

undertaken by M/s VA Tech. The committee<br />

submitted its report on causes of accident<br />

to KSEB on 17.11.2008. The team of CEA<br />

engineers visited the project from 15.03.2009<br />

to 20.03.2009. The report on R&M works has<br />

been finalized and sent to KSEB.<br />

5.16 Programme for the year 2010-11<br />

For the year 2010-11, it is programmed to<br />

complete eight (8) schemes having an installed<br />

capacity of 2738 MW (installed capacity of<br />

Nagjhari U-4 to 6 of KPCL is not included in<br />

the total as it has been accounted for in the other<br />

scheme namely Nagjhari, U-1 to U-6 of same<br />

station which is programmed for completion<br />

during the year 2009-10). On completion<br />

of these schemes, there will be a benefit of<br />

422 MW through Life Extension & Uprating at<br />

an estimated cost of about Rs. 310 crores.<br />

Sl.<br />

No.<br />

Name of Scheme<br />

Installed<br />

Capacity<br />

(MW)<br />

Agency<br />

1. Dehar Phase-A 6x165 BBMB<br />

2. Lower Sileru 4x115 APGENCO<br />

3. Nagarjuna Sagar 1x110+<br />

7x100.8<br />

APGENCO<br />

4. Nagjhari, U-4 to 3x135 KPCL<br />

U-6<br />

5. Lingnamakki 2x27.5 KPCL<br />

6. Sabirigiri 6x50 KSEB<br />

7. Jaldhaka St. I 3x9 WBSEB<br />

8. Loktak 3x30 NHPC<br />

5.17 Concurrence of CEA to Hydro<br />

Electric Schemes<br />

After the enactment of The Electricity<br />

Act, 2003 and its coming into force w.e.f. 10 th<br />

June, 2003, the Central Electricity Authority<br />

is required to accord concurrence to Hydro<br />

Generation Schemes estimated to involve a<br />

capital expenditure exceeding such sum as may<br />

be fixed by the Central Government from time to<br />

time, as per provisions of Section 8 of this Act.<br />

"CEA-Helping the Transformation of Indian Power Sector"<br />

63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!