Central electricity authority Annual Report 2009-10<br />
CHAPTER – 3<br />
POWER SYSTEMS PLANNING AND D]EVELOPMENT<br />
3.1 Transmission Planning<br />
All issues relating to planning and<br />
<strong>development</strong> of Transmission System in the<br />
country are dealt in the Power System Wing of<br />
CEA. This includes evolving long term and short<br />
term transmission plans. The network expansion<br />
plans are optimized based on network simulation<br />
studies and techno economic analysis. This also<br />
involves formulation of specific schemes, evolving<br />
a phased implementation plan in consultation<br />
with the Central and State transmission utilities<br />
and assistance in the process of investment<br />
approval for the Central Sector schemes,<br />
issues pertaining to <strong>development</strong> of National<br />
Power Grid in the country and issues relating<br />
to trans-country <strong>power</strong> transfer. Transmission<br />
planning studies are being conducted to identify<br />
evacuation system from generation projects and<br />
to strengthen the transmission system in various<br />
regions. The studies for long-term perspective<br />
plans are also being carried out on All India<br />
basis for establishing inter regional connectivity<br />
aimed towards formation of the National Power<br />
Grid system. The National Power Grid system<br />
is being evolved to facilitate free flow of <strong>power</strong><br />
across regional boundaries, to meet the short fall<br />
of deficit regions from a surplus region, for<br />
evacuation of <strong>power</strong> from project(s) located in<br />
one region to the beneficiaries located in other<br />
region(s) as well as facilitate trading of electricity<br />
among buyers and sellers in various regions.<br />
3.2 Inter-regional Transmission System<br />
in India-National Grid<br />
A National Power Grid in the country<br />
is being developed in phased manner. By now,<br />
all the regional grids have already been interconnected<br />
and total transmission capacity<br />
of inter-regional transmission system, as on<br />
31-03-2010 was 20750 MW. At present, except<br />
Southern Region, all the other four regions are<br />
inter-connected in synchronous mode and are<br />
operating in parallel.<br />
Total inter-regional transmission capacity<br />
by the end of 9 th Plan was 5750 MW. During 10 th<br />
Plan i.e. 2002-07, a total of 8300 MW of interregional<br />
capacities were added. Thus, total interregional<br />
transmission capacity by the end of<br />
10 th Plan was 14050 MW.<br />
During 11 th Plan i.e. 2007-12, interregional<br />
transmission systems of 18600 MW<br />
capacity have been planned and it is expected<br />
that, by end of 11 th Plan, total inter-regional<br />
transmission capacity of the National Power<br />
Grid would be increased to 32650 MW. Out of<br />
the programme for 11 th Plan, 2400 MW capacity<br />
was added during 2007-08, 3300 MW during<br />
2008-09 and 1000 MW during 2009-10. Thus a<br />
capacity addition of 6700 MW has already been<br />
added in 11 th Plan up to 31-03-2010.<br />
Details of existing and planned interregional<br />
transmission capacity up to end of 11 th<br />
Plan are shown in Annexure-3A.<br />
3.3 Regional Standing Committees on<br />
Power System Planning<br />
3.3.1 Introduction<br />
The Regional Standing Committees on<br />
<strong>power</strong> system planning constituted by CEA have<br />
representation of CEA, Transmission Utilities<br />
of constituent States of the region, Central<br />
Transmission Utility (i.e POWERGRID),<br />
representative of Central Sector Generating<br />
Companies and Regional Power Committee. The<br />
requirement of inter-state transmission system<br />
for evacuation of generation and for system<br />
improvement are evolved on the basis of <strong>power</strong><br />
32<br />
"Electricity is life: Conserve it."