Central electricity authority Annual Report 2009-10<br />
capacity of 544 MW have been identified for<br />
R&M works to accrue a benefit of 212 MW. The<br />
R&M activities of four schemes have already<br />
been completed at an actual expenditure of<br />
Rs. 105.68 Crores to accrue a benefit of 61 MW.<br />
The remaining five schemes are under various<br />
stages of implementation and are likely to be<br />
completed during the 11 th Plan to accrue a benefit<br />
of 151 MW at an estimated cost of Rs. 348 Crores.<br />
The Scheme-wise status (as on 31.01.2010) of<br />
the R&M works of the hydro schemes of Northeastern<br />
Region is given hereunder:-<br />
S. No. Name of Scheme,<br />
Agency, State<br />
1. Khandong,<br />
U-1, NEEPCO,<br />
Meghalaya<br />
2. Gumti, TSECL,<br />
Tripura<br />
3. Khandong, NEEPCO,<br />
Meghalaya<br />
4. Umium St.I MeSEB,<br />
Meghalaya<br />
5. Loktak, NHPC,<br />
Manipur<br />
6. Umium St.II,<br />
MeSEB, Meghalaya<br />
7. Kopili, NEEPCO<br />
Assam<br />
8. Kyrdemkulai,<br />
MeSEB, Meghalaya<br />
9. Khandong, NEEPCO,<br />
Meghalaya<br />
Installed<br />
Capacity<br />
(MW)<br />
Cost<br />
(Rs. in<br />
Crs.)<br />
Benefits<br />
(MW)<br />
Status<br />
1x25 0.62* 25 (Res.) U-1 Restoration works completed in<br />
1991-92.<br />
3x5 17.50* - R&M works completed in 1994-95.<br />
2x25 3.35* - R&M works completed in 2003-04.<br />
4x9 84.21* 36 (LE) RM&LE works completed in 2002-03.<br />
3x30<br />
(Derated)<br />
18.55@ 15 (Res.) R&M and Restoration works are<br />
ongoing. Unit-I commissioned on<br />
05.09.2009. All R&M works likely to<br />
be completed by 2009-10.<br />
2x9 90.46@ 18 (LE) +<br />
2 (U)<br />
2x50 +<br />
2x50<br />
RM&LE works yet to commence.<br />
JBIC funding. Likely to be completed<br />
by 2011-12.<br />
66.42@ - BHEL, the OEM have submitted their<br />
offer. Placement of order under process.<br />
Likely to be completed in 2011-12.<br />
2x30 168.00@ 60 (LE) +<br />
6 (U)<br />
RM&U works to commence after<br />
completion of Umium Stage-II works.<br />
DPR under preparation. Likely to be<br />
completed in 12 th Plan.<br />
2x25 5.00@ 50 (LE) R&M works yet to commence.<br />
Abbreviations: MW – Mega Watt; Res. – Restoration; U – Uprating; LE – Life Extension<br />
*= Actual, @= Estimated<br />
11.10 Installed Capacity in the N.E.<br />
Region<br />
The total installed capacity in the Region<br />
is as under:<br />
Sector<br />
Installed Capacity (MW)<br />
Hydro 1116.00*<br />
Thermal 968.74<br />
RES 204.16<br />
Nuclear -<br />
Total 2288.90<br />
*Excluding small hydro schemes covered under Renewable<br />
Energy Sources.<br />
128<br />