Central electricity authority Annual Report 2009-10<br />

capacity of 544 MW have been identified for<br />

R&M works to accrue a benefit of 212 MW. The<br />

R&M activities of four schemes have already<br />

been completed at an actual expenditure of<br />

Rs. 105.68 Crores to accrue a benefit of 61 MW.<br />

The remaining five schemes are under various<br />

stages of implementation and are likely to be<br />

completed during the 11 th Plan to accrue a benefit<br />

of 151 MW at an estimated cost of Rs. 348 Crores.<br />

The Scheme-wise status (as on 31.01.2010) of<br />

the R&M works of the hydro schemes of Northeastern<br />

Region is given hereunder:-<br />

S. No. Name of Scheme,<br />

Agency, State<br />

1. Khandong,<br />

U-1, NEEPCO,<br />

Meghalaya<br />

2. Gumti, TSECL,<br />

Tripura<br />

3. Khandong, NEEPCO,<br />

Meghalaya<br />

4. Umium St.I MeSEB,<br />

Meghalaya<br />

5. Loktak, NHPC,<br />

Manipur<br />

6. Umium St.II,<br />

MeSEB, Meghalaya<br />

7. Kopili, NEEPCO<br />

Assam<br />

8. Kyrdemkulai,<br />

MeSEB, Meghalaya<br />

9. Khandong, NEEPCO,<br />

Meghalaya<br />

Installed<br />

Capacity<br />

(MW)<br />

Cost<br />

(Rs. in<br />

Crs.)<br />

Benefits<br />

(MW)<br />

Status<br />

1x25 0.62* 25 (Res.) U-1 Restoration works completed in<br />

1991-92.<br />

3x5 17.50* - R&M works completed in 1994-95.<br />

2x25 3.35* - R&M works completed in 2003-04.<br />

4x9 84.21* 36 (LE) RM&LE works completed in 2002-03.<br />

3x30<br />

(Derated)<br />

18.55@ 15 (Res.) R&M and Restoration works are<br />

ongoing. Unit-I commissioned on<br />

05.09.2009. All R&M works likely to<br />

be completed by 2009-10.<br />

2x9 90.46@ 18 (LE) +<br />

2 (U)<br />

2x50 +<br />

2x50<br />

RM&LE works yet to commence.<br />

JBIC funding. Likely to be completed<br />

by 2011-12.<br />

66.42@ - BHEL, the OEM have submitted their<br />

offer. Placement of order under process.<br />

Likely to be completed in 2011-12.<br />

2x30 168.00@ 60 (LE) +<br />

6 (U)<br />

RM&U works to commence after<br />

completion of Umium Stage-II works.<br />

DPR under preparation. Likely to be<br />

completed in 12 th Plan.<br />

2x25 5.00@ 50 (LE) R&M works yet to commence.<br />

Abbreviations: MW – Mega Watt; Res. – Restoration; U – Uprating; LE – Life Extension<br />

*= Actual, @= Estimated<br />

11.10 Installed Capacity in the N.E.<br />

Region<br />

The total installed capacity in the Region<br />

is as under:<br />

Sector<br />

Installed Capacity (MW)<br />

Hydro 1116.00*<br />

Thermal 968.74<br />

RES 204.16<br />

Nuclear -<br />

Total 2288.90<br />

*Excluding small hydro schemes covered under Renewable<br />

Energy Sources.<br />