Central electricity authority Annual Report 2009-10<br />

mutual benefits has been under consideration<br />

with these countries. During the year, following<br />

works were handled:<br />

• Power potential studies were carried out<br />

for Naumure H.E. Project corresponding to<br />

different irrigation scenarios.<br />

• Feasibility Study Report of Arun-3<br />

Project prepared by SJVNL/ WAPCOS<br />

was examined from commercial viability<br />

aspects.<br />

• In the 5 th Meeting of Nepal-India Joint<br />

Committee on Water Resources (JCWR),<br />

Terms of Reference (ToR) for establishment<br />

of Pancheshwar Development Authority<br />

were finalized.<br />

• Proposal of NHPC for undertaking<br />

additional and confirmatory investigations<br />

for preparation of updated DPRs in respect<br />

of Tamanthi & Shwezaye HE Projects,<br />

Myanmar was examined.<br />

• The cost Estimates for preparation of DPR<br />

of Amochu (620 MW), Chamkharchu-I<br />

(670 MW), Kuri Gongri (1800 MW),<br />

Kholongchu (486 MW), Wanchu (900MW)<br />

and Bunakha (180 MW) were examined<br />

and recommended to MoP. Subsequently,<br />

agreements between GoI and RGoB were<br />

signed for Amochu, Chamkharchu-I, Kuri<br />

Gongri, Kholongchu HE Projects.<br />

• The Pre-feasibility Report on viability<br />

of Bunakha HEP (180 MW) prepared by<br />

THDC was examined and views of CEA<br />

have been sent to MoP.<br />

• The Feasibility Study Report of Wangchu<br />

HEP (900 MW) prepared by SJVNL<br />

was examined and recommended for<br />

<strong>development</strong> as RoR scheme.<br />

• The Em<strong>power</strong>ed Joint Indo-Bhutan Group<br />

Meeting was held on 22.03.2010. Views of<br />

CEA regarding Conversion of Wangchu HE<br />

Project type from Storage to ROR type were<br />

accepted.<br />

5.8.1 Other International Cooperation<br />

• The matters relating to cooperation with<br />

the countries like Russia, Canada, Congo &<br />

Tajikistan have been dealt.<br />

• A team of officers from MoWR, MEA and<br />

CEA visited China to attend Meeting of Joint<br />

Expert Level Mechanism (ELM) between<br />

India and China to discuss issues relating<br />

to trans-border rivers including exchange<br />

of hydrological data of Brahmaputra River<br />

etc.<br />

5.9 Hydro Power Plants Performance<br />

& Operation Monitoring<br />

Performance of 572 units in 160 hydro<br />

stations having capacity above 25 MW<br />

with aggregate installed capacity of<br />

35312.45 MW was analyzed in respect of<br />

their outages & generation and report on the<br />

review of HE stations for the year 2008-09<br />

was finalized.<br />

Mid-term review of generation performance<br />

of hydro-electric stations of the country<br />

for the year 2009-10 was carried out in<br />

Dec., 2009 after withdrawal of South-West<br />

monsoon by interaction with SEBs, Power<br />

Deptts. and CPSUs. The generation targets<br />

were reviewed for the remaining part of the<br />

year 2009-10.<br />

Month-wise/station-wise hydro generation<br />

targets in respect of hydro <strong>power</strong> generation<br />

having capacity above 25 MW for year<br />

2010-11 were drawn in consultation with<br />

various utilities and tentatively fixed<br />

at 111352 MU which was about 3.69%<br />

lower than generation targets for the year<br />

2009-10.<br />

To accord recognition to hydro <strong>power</strong><br />

stations for their all round performance,<br />

58<br />

"Energy Saved is Energy Generated"