thermal power development - Infraline
thermal power development - Infraline
thermal power development - Infraline
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Central electricity authority Annual Report 2009-10<br />
It can be seen from the above data that the<br />
number of cases received for PTCC route<br />
approval have increased by 38%. The total<br />
circuit kilometers of the EHT lines (Total<br />
length of 220 kV, 400 kV & 500 kV HVDC)<br />
for which PTCC route approval has been<br />
accorded, has increased by 15%.<br />
4.8.1 Computerisation of PTCC<br />
In order to cut down the processing time<br />
of PTCC route approval, a proposal for the<br />
computerization of PTCC process was forwarded<br />
to Ministry of Power for sanction and is under<br />
process by MoP. The estimated cost of the<br />
scheme is Rs. 1466 Lakhs. A budget provision<br />
of Rs.100 Lakhs has been kept for the year 2010-<br />
11 towards appointing the consultant.<br />
4.9 Establishment of Load Despatch<br />
& Telecommunication Facilities<br />
for Power Sector<br />
All the five Unified Load Despatch<br />
and Communication (ULDC) schemes are in<br />
operation for about last 8 years. Unified Load<br />
Despatch Scheme Monitoring Group (USMG)<br />
which has been inter-alia entrusted the work of<br />
formulating minimum standard requirements<br />
for ULDC scheme (phase-II) for replacement /<br />
upgradation / expansion and O&M of the<br />
ULDC system in Northern Region, CEA has<br />
been providing technical input to the Group /<br />
Committee.<br />
4.10 National Load Despatch Centre<br />
(NLDC)<br />
The National Load Despatch Centre<br />
(NLDC) was commissioned last year and the<br />
same has been running successfully.<br />
4.11 Frequency Allocation Coordination<br />
for Microwave<br />
and Power Line Carrier<br />
Communication (PLCC)<br />
CEA co-ordinates and follows up with<br />
Wireless Planning and Co-ordination (WPC)<br />
Wing of Department of Telecommunications<br />
(DoT) to accord frequency allocation for<br />
PLCC system of new <strong>power</strong> transmission<br />
lines and VHF/ UHF / Microwave systems of<br />
<strong>power</strong> utilities.<br />
As per the WPC, the frequency band 2.3-<br />
2.4 GHz used for microwave communication<br />
in the ULDC schemes for Load Despatch<br />
systems is to be vacated. CEA examined the<br />
case and has been providing required technical<br />
input to the Ministry of Power.<br />
During the financial year 2009-<br />
10, frequency allocations for PLCC for<br />
"Electricity is life: Conserve it."<br />
53