27.07.2014 Views

thermal power development - Infraline

thermal power development - Infraline

thermal power development - Infraline

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Central electricity authority Annual Report 2009-10<br />

(2/3)<br />

Standing Committees meeting on <strong>power</strong> system planning in Eastern Region was held on 14-09-2009 and resolved<br />

the following issues related to transmission system planning<br />

(i) Transmission System Associated with the Tilaiya UMPP (4000 MW) in Jharkhand, Barh-II (1320 MW) & Nabinagar<br />

(1000MW) in Bihar (JV of Railways and NTPC).<br />

‣ Generation Specific Transmission System<br />

‣ System strengthening scheme in ER<br />

‣ ATS (under the scope of Generation Developer) to Haldia (600MW), Adunik(1000MW), Essar(1800MW),<br />

Electrosteel (1200MW), Corporate (800MW), CESC Dumka (1200MW) and Orissa IPPs Generation Projects<br />

(ii) 400kV Transmission proposals of GRIDCO, Orissa during 11 th Plan Period.<br />

(iii) Transmission works of WBSEDCL under State Sector:<br />

27 th Meeting of the Standing Committee on Power System Planning in Northern Region<br />

• System strengthening scheme in Punjab<br />

• Evacuation of <strong>power</strong> from Kutehr HEP (260 MW) in the upstream of Chamera III HEP<br />

• System strengthening of Haryana<br />

• Augmentation of Transformation Capacity at Maharani Bagh Substation<br />

• Transfer of Power from Lucknow 765/400 kV substation towards Western part of Northern Grid<br />

• Tehri PSP Transmission System<br />

• Establishment of Samba 400/220 kV Sub-station in J&K and Provision of Second 400 kV S/C for reliable<br />

evacuation of <strong>power</strong> from Dulhasti HEP<br />

• Augmentation of Transformation Capacity at Bahadurgarh and Lucknow<br />

• Connectivity with HVDC Bipole Terminal at Mohindergarh<br />

• Sasan/Vindchyachal pool connectivity/Power evacuation system from Rihand III TPS (2x500 MW)<br />

• Transmission System Associated with the Tilaiya Ultra Mega Power-Project (4000 MW), in Jharkhand,<br />

Nabinagar (1000MW) of Railways and NTPC, Barh-II (1320 MW) and IPPs in Jharkhand, Orissa, MP,<br />

Chattisgarh, and Maharashtra”<br />

• Enhancing System Reliability by LILO of 400 kV Dehar-Bhiwani and 400 kV Dehar-Panipat<br />

• Enhancing Reliability of Generation at Paricha Thermal Power Station<br />

• Overloading of 2x315 MVA, 400/220 kV ICTs at Bassi as well as Bhiwadi<br />

• Network Constraints in Uttarakhand<br />

• Evacuation of <strong>power</strong> from generation projects coming up in Sikkim and Bhutan<br />

• Proposed Evacuation System of various <strong>thermal</strong> projects in Rajasthan – Agenda by RRVPNL<br />

28 th Meeting of the Standing Committee on Power System Planning in Northern Region<br />

• Dehradun – Abdullapur 400kV D/C<br />

• Augmentation of transformation of Raibareilly<br />

• Provision of Bus reactors in Northern region<br />

• Provision of 2 nos. of 220kV line bays at Allahabad POWERGRID sub-station<br />

• Dulhasti-Samba 400kV D/C<br />

• Transmission System associated with Tilaiya UMPP (4000 MW) in Jharkhand<br />

• Transmission system associated with IPPs located in Orissa, Jharkhand, West Bengal, Madhya Pradesh,<br />

Chattisgarh and Southern Region<br />

• Grant of Membership for HPPTCL<br />

• Evacuation of Bagliar-II (3x150 MW) and Ratle (690 MW) HEPs in J&K<br />

• MEJA 1320 MW PROJECT – JV of NTPC and UPRVNL<br />

• 400 kV Kishenpur-New Wanpoh D/C line<br />

• Hissar TPS Evacuation system<br />

"Electricity is life: Conserve it."<br />

143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!