Central electricity authority Annual Report 2009-10<br />

38<br />

‣ Short circuit and load flow studies for<br />

Enhancing System Reliability by LILO of<br />

400 kV Dehar-Bhiwani and 400 kV Dehar-<br />

Panipat.<br />

‣ Load flow studies carried out to study the<br />

revised project report for infrastructural<br />

<strong>development</strong> at 220 kV & 132 kV<br />

transmission level under Prime Minister's<br />

Reconstruction Plan for J&K State was<br />

examined and fresh load flow studies<br />

were carried out with the proposals and<br />

recommended the same to MoP.<br />

‣ Transmission planning studies for<br />

strengthening of 400 kV and 220 kV network<br />

in northern part of Tamil Nadu.<br />

3.10 Consultancy services and assistance<br />

to various utilities<br />

(i) Power Development Department, Govt.<br />

of J&K: 220kV and 132kV Transmission<br />

Projects under Prime Minister’s<br />

Reconstruction Program.<br />

(ii) Bhutan Power Corporation, Govt. of<br />

Bhutan: 132kV and 66kV Transmission<br />

and substation works.<br />

(iii) WAPCOS: Transmission and Substation<br />

work relating to Salma Hydro Project,<br />

Afghanistan.<br />

(iv) Damodar Valley Corporation: Design<br />

of 220kV Multicircuit, 132kV and 33kV<br />

Transmission Line Towers.<br />

(v) Assistance to Delhi Transco Ltd. and<br />

APTRANSCO in the preparation of<br />

technical specification and evaluation of<br />

tenders for 220 kV & 132 kV XLPE Cables<br />

and GIS Substation.<br />

3.10.1 Representation/Nomination in the<br />

Committees<br />

(a) A Committee under the Chairmanship<br />

of Chief Engineer (SETD), CEA was<br />

constituted to investigate causes of failure<br />

and to suggest remedial measures to avert/<br />

minimize the recurrence in respect of the<br />

following:-<br />

i) Transmission line towers of 220kV &<br />

above Voltage Class<br />

ii) Various substation equipment of<br />

220 kV and above Voltage Class<br />

(b) CEA is representsed on Electro-technical<br />

Division Council and Indian National<br />

Committee- International Electro-technical<br />

Commission and Chairman of Conductors<br />

and Accessories for Overhead Lines<br />

Sectional Committee.<br />

3.11 Analysis of causes of failure of<br />

Transmission Line Tower & Substation<br />

equipment<br />

3.11.1 Transmission Line Towers Failure<br />

of 400 kV line Towers<br />

Failures of 400 kV transmission line<br />

towers of Power Grid were investigated<br />

and remedial measures suggested. Standing<br />

Committee of Experts headed by CE (SETD),<br />

CEA submitted report in respect of the<br />

following lines:-<br />

1. 400 kV Dadri-Ballabhgarh D/C Line<br />

2. 400 kV Allahabad- Mainpuri D/C Line<br />

3. 400 kV Jabalpur-Itarsi D/C Line<br />

4. 400 kV Dadri- Mandola D/C Line<br />

5. 400 kV Vindhyachal- Jabalpur ckt.-I & II<br />

D/C Line<br />

6. 400 kV Farakka-Sagardighi Circuit-I and<br />

Farrakka- Durgapur Line<br />

7. 400 kV Kanpur-Ballabhgarh S/C Line<br />

(Kanpur Etah Section)<br />

8. 400kV Korba- Bhilai circuit-I S/C Line<br />

9. 400 kV Khandwa-Dhule D/C Line<br />

10. 400kV Meerut- Muzaffarnagar S/C Line<br />

11. 400 kV Malda- New Purnia LILO D/C<br />

Line.<br />

3.11.2 Sub-station Equipment<br />

As a part of activity of Standing<br />

Committee to assess the cause of failure of<br />