Central electricity authority Annual Report 2009-10<br />
distribution system for supply of <strong>power</strong> to<br />
Marchak area in Sikkim.<br />
vii) FR-cum-DPR for Teesta-IV HEP (4x130<br />
MW) in Sikkim by M/s NHPC Ltd.<br />
viii) FR-cum-DPR for Panan H.E. Project<br />
(4x75 MW) in Sikkim by M/s Himagiri<br />
Hydro Energy Pvt. Ltd.<br />
North-Eastern Region<br />
i) Siang Lower HEP (9x300 MW)<br />
ii) Demwe Lower HEP (5x342 + 40 MW)<br />
iii) Tato –II HEP (4x175 MW)<br />
iv) Nyamjangchhu HEP (6x150 MW)<br />
v) Dibbin HEP (120 MW)<br />
vi) Tawang –I HEP (4x250 MW)<br />
vii) Tawang –II HEP (3x250 MW)<br />
viii) Nafra HEP ( 2x48 MW)<br />
ix) Gongri HEP (90 MW)<br />
x) RCE for Kameng HEP (4x150 MW)<br />
Central Sector<br />
i) Transmission System associated with Sasan<br />
(4000 MW) UMPP<br />
ii) Transmission System associated with<br />
Mundra (4000 MW) UMPP<br />
iii) Transmission System associated with<br />
Korba-III (500 MW)<br />
3.5 Examination and appraisal of<br />
Transmission Schemes for approval<br />
under Section 68 of Electricity Act,<br />
2003 during 2009-10<br />
A list of transmission proposals examined<br />
for approval u/s 68 is given below:<br />
‣ Common System associated with Simhapuri,<br />
Meenakshi, Krishnapatnam (Navyuga) and<br />
Krishnapatnam(APPDCL) LTOA projects<br />
in Krishnapatnam area of Andhra Pradesh.<br />
‣ Common System associated with Coastal<br />
Energen Private Ltd. and Ind –Barath<br />
Power(Madras)Limited LTOA generation<br />
project in Tuticorin Area Part-A.<br />
‣ Common System associated with Coastal<br />
Energen Private Ltd. and Ind –Barath Power<br />
(Madras) Limited LTOA generation project<br />
in Tuticorin Area-Part-B.<br />
‣ Common Transmission System associated<br />
with East Coast and NCC Power Projects in<br />
Srikakulam Area.<br />
‣ Eastern Regional Strengthening Scheme-III.<br />
‣ Revised Eastern Regional Strengthening<br />
Scheme-III.<br />
‣ Transmission System for transfer of<br />
<strong>power</strong> from generation projects in Sikkim<br />
to NR/WR and transmission system for<br />
<strong>development</strong> of new pooling station in<br />
Northern part of West Bengal/Bihar and<br />
transfer of <strong>power</strong> from Bhutan to NR/WR.<br />
‣ Transmission system for immediate<br />
evacuation of <strong>power</strong> from Tilaiya UMPP<br />
(4000MW) by PGCIL in Jharkhand.<br />
‣ Transmission system for evacuation of<br />
<strong>power</strong> from Orissa IPPs Phase-I.<br />
‣ Eastern Regional Strengthening Scheme-IV.<br />
‣ Combined Transmission system in NR/WR/<br />
ER for evacuation of <strong>power</strong> from Orissa<br />
IPPs Phase-I.<br />
‣ Installation of overhead lines under<br />
Transmission System associated<br />
interconnection between Electrical Grid of<br />
India and Bangladesh- Indian portion.<br />
‣ Dedicated Transmission System for<br />
connecting Jindal TPS (2x600 MW) with the<br />
Angul pooling station of CTU (PGCIL).<br />
‣ 400 kV Pallatana-Silcher-Bongaigaon<br />
D/C line, being developed under JV by<br />
M/s NETC as part of evacuation system<br />
associated with Palatana GBPP (726.6 MW)<br />
and Bongaigaon TPS (750MW).<br />
‣ Laying of inter-state dedicated 2500MW<br />
(± 500 MW) HVDC Bipole Mundra<br />
(Gujarat) – Mohindergarh (Haryana)<br />
transmission line.<br />
34<br />
"Energy Saved is Energy Generated"