Central electricity authority Annual Report 2009-10<br />
11.11 Hydro Power Generation Performance<br />
Hydro <strong>power</strong> generation during the year<br />
2009-10 in the North-eastern Region is 3416.80*<br />
MU against a target of 4404.00 MU, which<br />
shows 77.58 % achievement.<br />
11.12 Ministry of Development of Northeastern<br />
Region (DONER)<br />
1. The following ST&D schemes of NE States<br />
for funding under NLCPR were technically<br />
cleared-<br />
• Scheme for complete electrification of<br />
Lord Buddha Statue including garden<br />
along with conversion of existing<br />
overhead LT lines into U/G cables with<br />
modernization and refurbishment of<br />
existing electrical network at Rabong<br />
Bazar in South Sikkim.<br />
• Scheme for installation of 1x15 MVA<br />
Transformer & extension bay at<br />
66/11 kV Substation, Mamring, South<br />
Sikkim.<br />
• Scheme for erection of 33 kV line from<br />
Mebo to Dambuk for evacuation of<br />
<strong>power</strong> in Arunachal Pradesh.<br />
2. The following schemes were examined<br />
for NE States and comments were sent to<br />
DONER/ NE States–<br />
• Scheme for construction of 33 kV<br />
transmission line from Namchi to<br />
Damthang and Temi and Sub-station at<br />
Temi/Damthang in Sikkim for funding<br />
under NLCPR.<br />
• Scheme for erection of 11 kV line from<br />
132/33 kV Karong S/s to Senapati New<br />
Secretariat Complex with installation<br />
of new distribution transformers in<br />
Manipur to be funded under NLCPR.<br />
• Scheme for installation of 2x2.5 MVA,<br />
3 /11 kV S/s along with associated<br />
33 kV line at Mao in Manipur, to be<br />
funded under NLCPR.<br />
• Scheme for construction of 66/11 kV,<br />
2x2.5. MVA S/s at Old Namchi and<br />
upgradation of 2x2.5 MVA S/s to 2x7.5<br />
MVA S/s at Namchi, Sikkim to be<br />
funded under NLCPR.<br />
11.13 Status of Rural Electrification in<br />
North-eastern Region<br />
During 2009-10 (upto Feb. 2010), 6 (six)<br />
inhabited villages have been electrified and no<br />
pumpsets have been energized. Cumulatively,<br />
29,665 inhabited villages constituting 73.5%<br />
have been electrified out of a total of 40,377<br />
inhabited villages and 8,844 pumpsets have been<br />
energized in the North-eastern States.<br />
11.14 The issues pertaining to Sectoral<br />
Development of Power System in<br />
the North-eastern Region<br />
(i) Sectoral meeting on Development of<br />
Power System in the North-eastern<br />
Region<br />
The Sub-Group, constituted under the<br />
chairmanship of Member (Power System),<br />
CEA, tabled a report on comprehensive<br />
transmission, sub-transmission and distribution<br />
system in NER & Sikkim in Dec. 2007 in<br />
consultation with the States of NER and<br />
POWERGRID. The scheme was formulated in<br />
three phases/ Phase-I during 2007-11, Phase-II<br />
during 2011-14 and Phase-III during 2014-17.<br />
Subsequently, the job for preparation of DPR<br />
was entrusted to M/s PGCIL.<br />
Accordingly, POWERGRID has prepared<br />
and submitted a DPR in January 2010 covering<br />
requirements of intra-State and inter-State<br />
transmission, sub-transmission and State-wise<br />
distribution system in NER and Sikkim at an<br />
estimated cost of Rs 9890.17 Crores. The details<br />
of the estimated cost are given below:<br />
"CEA-Helping the Transformation of Indian Power Sector"<br />
129