Central electricity authority Annual Report 2009-10<br />

2009-10 in respect of transmission lines are<br />

given in Charts I to IV.<br />

Similarly, for the year 2009-10 in respect<br />

of transformation capacity, a programme<br />

of addition of 2500 MW at +500 kV HVDC<br />

13860 MVA at 400 kV and 14260 at 220 kV<br />

was envisaged. Against this programme,<br />

the achievement during the year was 5225<br />

MVA at 400 kV level and 11735 MVA at<br />

220 kV respectively. In respect of +500 kV<br />

HVDC terminal as against the programme of<br />

2500 MW, the achievement during 2009-10 is<br />

nil as the +500 kV HVDC line and converter<br />

stations are yet to be commissioned even<br />

though the same are ready for commissioning.<br />

Details of sub-stations completed during<br />

2009-10 are given in Annexure-3D.<br />

Voltage-wise / Sector-wise actual<br />

achievement vis-à-vis programme for the year<br />

2009-10 in respect of Sub-stations are given in<br />

Charts V and VI.<br />