Central electricity authority Annual Report 2009-10<br />

(i) Suggestions for annual budgetary exercise<br />

relating to Customs & Central Excise Duty<br />

for 2009-10<br />

(ii) Service Tax on Wheeling/ Transmission of<br />

Power<br />

(iii) Levy of Service tax on electricity<br />

transmission & SLDC charges<br />

(iv) Implementing the Integrated Energy Policy<br />

(IEP) : Action Taken Report by Ministry of<br />

Power<br />

(v) Report of the Study Group for preparation<br />

of a Road Map for Rapid Economic<br />

Development of Uttar Pradesh<br />

(vi) Suggestions for annual budgetary exercise<br />

relating to Customs & Central Excise Duty<br />

for 2010-11<br />

(vii) Disciplines in domestic regulations at the<br />

WTO<br />

(viii) Exemption of excise duty on liquid fuels<br />

(Low Sulphur Heavy Stock, Naptha, Diesel<br />

& Furnace Oil) used for <strong>power</strong> generation<br />

(ix) Clarifications on the exemptions for Mega<br />

& Ultra Mega Power Projects<br />

9.4 Data Bank for Cost of Generation of<br />

Power<br />

The process of creating a data bank<br />

regarding rate of sale of <strong>power</strong> classified by type<br />

of generation for various Utilities/SEBs/Power<br />

Departments is under progress. With the creation<br />

of a large number of generating companies, the<br />

work of data collection, sifting and compilation<br />

has increased manifold. A statement indicating<br />

region-wise rate of sale of <strong>power</strong> for various<br />

Central, State & Private utilities in the country<br />

for the period the year 2008-09 is given at<br />

Annexure-9C.<br />

9.5 Progress in Bidding Process of Ultra<br />

Mega Power Projects (UMPPs)<br />

CEA has been regularly associated with<br />

the finalization of Request for Qualification<br />

(RfQ), Request for Proposal (RfP) and Power<br />

Purchase Agreement (PPA) for setting up of<br />

Ultra Mega Power Projects (UMPPs) in the<br />

country and in this regard, had represented<br />

in various committees. The successful<br />

bidders for four Ultra Mega Power Projects<br />

have already been selected through the tariff<br />

based International Competitive Bidding<br />

process, based on the Capacity and Super/<br />

Critical technology, specified in the RfQ &<br />

RfP documents issued by the shell companies<br />

and Letter of Intent has been issued to the<br />

successful developers. The bidders quoted the<br />

tariff for 25 years. Power Finance Corporation<br />

is the designated Nodal Agency for the entire<br />

bid process. The status of various UMPPs is<br />

as under:<br />

i. Mundra UMPP (5x800 MW) in Gujarat<br />

The Letter of Intent (LoI) was awarded<br />

to M/s Tata Power Ltd. on 28 th December, 2006<br />

with a levelised tariff of Rs. 2.264 per Kwh. The<br />

project was handed over on 23.04.07.<br />

ii.<br />

Sasan UMPP (6x660 MW) in Madhya<br />

Pradesh<br />

The Letter of Intent (LoI) was awarded<br />

to M/s Reliance Power Ltd. on 1 st August, 2007<br />

with a levelised tariff of Rs. 1.196 per Kwh. The<br />

project was handed over on 07.08.07.<br />

iii. Krishnapatnam UMPP (5x800 MW) in<br />

Andhra Pradesh<br />

The Letter of Intent (LoI) was awarded to<br />

M/s Reliance Power Ltd. on 30 th November, 2007<br />

with a levelised tariff of Rs. 2.333 per Kwh. The<br />

project was handed over on 29.01.08.<br />

“CEA-Helping the Transformation of Indian Power Sector”<br />

99