Central electricity authority Annual Report 2009-10<br />
S.<br />
No.<br />
Name of the Institute<br />
1. Employee Development Centre, Kahalgaon STPS of NTPC Ltd.<br />
2. Hydro Training Institute, Kuthiraikalmendu, TNEB<br />
3. Centre for Research and Industrial Staff Performance, Bhopal.<br />
4. National Power Training Institute(SR), Neyveli<br />
5. Jindal Institute for Power Technology, Raigarh, Chhattisgarh<br />
6. Power Engineer Training and Research Centre, KSEB, Moolamattam<br />
7. Officer Training Institute, RVPNL, Jaipur<br />
8. Technical Training Centre Dahanu Thermal Power Station, REL<br />
9. National Power Training Institute (ER), Durgapur<br />
10. O&M Solution Power Training Institute, Bhubaneswar<br />
11. Employee Development Centre, Ramagundam STPS of NTPC Ltd.<br />
12. Training Institute Dr. Narula Tata Rao Thermal Power Station (formerly VTPS), Vijayawada,<br />
APGENCO<br />
13. Employee Development Centre, Singrauli STPS, NTPC Ltd.<br />
14. Employee Development Centre, Rihand STPS, NTPC Ltd.<br />
15. O&M Training Institute, CESC Ltd., Kolkata<br />
16. Plant Training Centre at Titagarh Generating Station CESC Ltd.<br />
17. Training Institute, Southern Generating Station, CESC Ltd., Kolkata<br />
18. Plant Training Centre, Budge Budge Generating Station, CESC Ltd., Kolkata<br />
19. GMR Energy Training Institute, Mangalore<br />
20. Employee Development Centreof NTPC at BTPS, New Delhi<br />
21. Employee Development Centre, National Capital Power Station of NTPC at Dadri (UP)<br />
22. Employee Development Centre at Farakka STPS of NTPC.<br />
12.5 “Adoption of ITI” Scheme<br />
Central Electricity Authority and the Ministry<br />
of Power organized an International Conclave on<br />
‘Key Inputs’ for Accelerated Development of<br />
Power Sector during 11 th Plan on 4 th & 5 th July,<br />
2007 wherein Utilities, State Governments,<br />
Central & State Regulatory Commissions and<br />
other organizations participated. In the wake of<br />
the International Conclave, the ‘Adoption of ITI<br />
Scheme’ was launched by MoP & CEA and the<br />
CPSUs were advised to adopt one or more ITIs<br />
near to the project sites to build up the required<br />
skilled man<strong>power</strong>.<br />
Nine Central Sector Power Utilities have<br />
adopted fifty two ITIs (including 8 new ITIs<br />
under construction) near their project sites to<br />
upgrade them to provide quality man<strong>power</strong> for<br />
the Power Sector. CEA has been facilitating the<br />
process of adoption of ITIs and monitoring the<br />
progress of adoption.<br />
During October 2007, the Ministry of<br />
Power organized a Seminar on "Requirement<br />
of Highly Qualified Man<strong>power</strong> for the Power<br />
Sector". In the follow up to the decisions taken<br />
in the Seminar, the Ministry of Power constituted<br />
five Task Forces on Integration of ITIs to build<br />
up a base of skilled man<strong>power</strong>. The Task Forces<br />
have submitted their reports. Task Force-IV inter<br />
alia included ‘Establishing a Power Job Portal’.<br />
In accordance with the recommendations of the<br />
Task Force, a web portal exclusively for <strong>power</strong><br />
"Energy Saved is Energy Generated"<br />
133