Central electricity authority Annual Report 2009-10<br />

5.12 Plan-wise summary of hydro R&M schemes (as on 31.03.2010)<br />

i) Hydro R&M schemes completed up to 10 th Plan<br />

Sl.No. Plan Period Nos. of Projects Installed<br />

Capacity<br />

(MW)<br />

Central<br />

Sector<br />

State<br />

Sector<br />

Total<br />

Estimated<br />

Cost<br />

(Rs. in Crs.)<br />

Actual<br />

Expenditure<br />

(Rs. in Crs.)<br />

Benefit<br />

(MW)<br />

1. Upto 8 th Plan<br />

Schemes<br />

completed<br />

2. 9 th Plan<br />

Schemes<br />

completed<br />

3. 10 th Plan<br />

Schemes<br />

completed<br />

2 11 13 1282 126 127 429<br />

8 12 20 4892 598 570 1093<br />

5 27 32 4337 1016 1029 829<br />

ii) Hydro R&M schemes planned during 11 th Plan (Revised)<br />

Sl.No<br />

Plan Period<br />

(2007-2012)<br />

Central<br />

Sector<br />

No. of Projects<br />

State<br />

Sector<br />

Total<br />

Installed<br />

Capacity<br />

(MW)<br />

Estimated<br />

Cost<br />

(Rs. in<br />

Crs.)<br />

Actual<br />

Expenditure<br />

(Rs. in Crs)<br />

Benefit<br />

(MW)<br />

a) Programmed<br />

(Original)<br />

b) Programmed<br />

(Revised)<br />

10 46 56 10810 4203 842 4098.45<br />

[244.00(U)<br />

+ 3824.45<br />

(LE)+ 30.0<br />

(Res.)]<br />

5 24 29 7888 1524 692 2029.30<br />

[216.00(U) +<br />

1798.30(LE)<br />

+ 15.0(Res.)]<br />

c) Completed 2 11 13 3204 272 205 380.00<br />

[10.00(U) +<br />

370.00(LE)]<br />

d) Ongoing 3 3 16 4694 1251 487 1649.30<br />

[206.00(U) +<br />

1428.30(LE)<br />

+<br />

15.00(Res.)]<br />

"Energy Saved is Energy Generated"<br />

61