Central electricity authority Annual Report 2009-10<br />
been compared with the International data with<br />
respect to some of the developed and developing<br />
nations.<br />
The booklet contains maps and charts<br />
presenting a panoramic view of the growth of<br />
Indian Electricity Sector.<br />
2.5 Standing Committee on Derating,<br />
Uprating and Retirement of Installed<br />
Capacity of Stations<br />
A Standing Committee is constituted<br />
under the chairmanship of Member (Planning)<br />
for considerating the proposals of derating,<br />
uprating & retirement of electricity generating<br />
capacity of <strong>power</strong> stations.<br />
The Committee considers the<br />
performance of the units, analyzes the<br />
performance data vis-a-vis the overall<br />
generation throughout the life of the plant<br />
and carries out detailed scrutiny of technical<br />
parameters of the proposed units. Keeping in<br />
view the merits of the proposals from case to<br />
case, the committee makes recommendations<br />
for the approval of the Chairperson/Authority.<br />
During the year 2009-10, the proposal of<br />
extension of temporary deration of Loktak<br />
HE Station (3x35MW) to (3x30MW) was<br />
approved. The proposals of following <strong>power</strong><br />
generating units are under consideration<br />
of Standing Committee for Upration /<br />
Deration:<br />
Sl.<br />
No.<br />
Name of the Station & unit<br />
nos.<br />
Installed<br />
capacity<br />
(MW)<br />
Derated /<br />
Uprated<br />
capacity<br />
(MW)<br />
Net upration /<br />
deration (MW)<br />
Utility Agency<br />
1. Papanasam HE Project 4x7 4x8 Net Upration 4MW TNEB<br />
2. Mettur Dam Power House 4x10 4x12.5 Net Upration 10 MW TNEB<br />
3. Khandong HE Station 2x25 2x22 Net Deration 6 MW NEEPCO<br />
4. Kopili Stage-II 1x25 1x21 Net Deration 4 MW NEEPCO<br />
5. Kopili Power Station 4x50 4x49 Net Deration 4 MW NEEPCO<br />
6. Bhusawal TPS Unit No.1 1x55 1x50 Net Deration 5 MW MAHAGENCO<br />
7. Bhusawal TPS Unit No.2 1x210 1x190 Net Deration 20 MW MAHAGENCO<br />
8. Chandrapur TPS Unit No.1 &2 2x210 2x185 Net Deration 50 MW MAHAGENCO<br />
9. Nasik TPS Unit No.1&2 2x125 2x100 Net Deration 50 MW MAHAGENCO<br />
10. Koradi TPS Unit No.1 to 4 4x105 4x85 Net Deration 80 MW MAHAGENCO<br />
2.6 Implementation of initiative of<br />
Working Group-III on 'National<br />
Mission on Enhanced Energy<br />
Efficiency' for retirement of TPS in<br />
11 th Plan.<br />
Ministry of Power, under National<br />
Action Plan on Climate Change (NAPCC) has<br />
initiated 'National Mission on Enhanced Energy<br />
Efficiency' (NMEEE) considering retirement<br />
of old small sized inefficient <strong>thermal</strong> units. As<br />
a follow-up to the recommendation of NMEEE<br />
regarding retirement of old and inefficient<br />
<strong>thermal</strong> generating units, CEA has undertaken<br />
an exercise by identification of <strong>thermal</strong> units for<br />
phased retirement during 11 th & 12 th Plan periods.<br />