Central electricity authority Annual Report 2009-10<br />
• Non-availability of funds and poor financial<br />
condition of State Electricity Boards (SEBs).<br />
6.12.2 Improvement in PLF due to<br />
implementation of R&M / Life<br />
Extension works<br />
There has been considerable<br />
improvement in most of the units where<br />
Life Extension works were carried out. The<br />
details of PLF before and after LE works are<br />
tabulated below:<br />
Sl.<br />
No.<br />
1<br />
Change in PLF where Life Extension works completed during the 11 th Plan.<br />
Utility<br />
Name of<br />
Station<br />
Unit<br />
No.<br />
Before<br />
LEP/<br />
Derated<br />
PLF<br />
before<br />
LEP **<br />
PLF<br />
after<br />
LEP<br />
(Status as on March 2010)<br />
Remarks<br />
UPRVUNL Obra 2 40 0 75.0 Unit synchronised on<br />
5 th February, 2009.<br />
2 UPRVUNL Obra 6 94 0 66.0 Unit synchronised on<br />
20 th March, 2008.<br />
3 UPRVUNL Harduaganj 5 60 0 55.0 Unit synchronised on<br />
27 th May,2008.<br />
4 GSECL Ukai 1 120 40 65.0 Unit synchronised on<br />
24 th May, 2008.<br />
5 HPGCL Panipat 1 110 58 78.0 Unit synchronised on<br />
4 th Nov, 2008.<br />
6 UPRVUNL Obra 1 40 0 65.0 Unit synchronised on<br />
4 th May, 2009.<br />
7 GSECL Ukai 2 120 52 71.0 Unit synchronised on<br />
24 th February, 2010.<br />
** Average PLF of last three years before LE.<br />
6.12.3 LE and R&M Targets during 2010-<br />
2011 & 2011–12 of 11 th Plan<br />
Broad details of State / Central<br />
Sector-wise LE/ R&M works to be taken up<br />
during 2010-2011 & 2011-12 of 11 th Plan are<br />
furnished below:<br />
Sl.<br />
No<br />
Particulars State Sector Central Sector Total<br />
(State + Central )<br />
No. of<br />
units<br />
Capacity<br />
(MW)<br />
No. of<br />
units<br />
Capacity<br />
(MW)<br />
No. of<br />
units<br />
Capacity<br />
(MW)<br />
1 LE works 19 2670 17 2527 36 5197<br />
2 R&M works 9 1665 11 2690 20 4355<br />
Total 28 4335 28 5217 56 9552<br />
"CEA-Helping the Transformation of Indian Power Sector"<br />
75