Washington Metropolitan Area Transit Authority<br />
Proposed <strong>FY2017</strong> Budget<br />
Chapter 3<br />
from planning through contract close out. The automated system will provide visibility into<br />
procurement requests, solicitations, and contracts, and will have self-service features for internal<br />
and external transactions with bidders and vendors. The system will be the single, centralized<br />
repository for managing all procurement related activities. The purpose is to modernize and<br />
automate the lifecycle of a contract, reduce manual efforts, streamline processes and leverage the<br />
existing PeopleSoft Financials and supply Chain (FSCM) system to support end to end<br />
procurement activities with audit trail of all actions, events, and modifications within one system.<br />
To achieve this objective, in FY2016, the PeopleSoft system is expanded to include a new module<br />
called Supplier Contract Management and new custom built features to accommodate activities<br />
related to initiating procurement requests, generating procurement-ready packages, collaboration,<br />
and securing approvals with automated workflow and routing. The remaining system functionality<br />
for solicitation and contract management will be delivered through a combination of reconfiguring<br />
and customizing existing PeopleSoft modules called Strategic Sourcing, Supplier<br />
Portal and eProcurement. Its notification process will remind each team what has to be done and<br />
when, so that procurement related documentation and approvals remain on track.<br />
CLM has a dedicated training team focused on delivering training to all users starting in February<br />
2016. The system is planned to go live in March 2016.<br />
Network and Communications<br />
In preparation for the Rail Station Router Upgrade program, a comprehensive technical and<br />
financial benchmark study of the dominate manufacturers’ of network routers and services was<br />
conducted. The results of the benchmark was the selection of a manufacturer whose products were<br />
determined to yield the best value to Metro measured in both cost and performance over the<br />
expected life of the network router.<br />
• Completed the deployment of wireless networking capabilities in 32 of 95 Rail Stations for<br />
Metro’s operational use.<br />
• Completed a benchmark study of the leading emergency telephone manufacturers. The<br />
results of the benchmark was the selection of a manufacturer whose product was<br />
determined to yield the best value to Metro measured in both cost and performance. Began<br />
the procurement activities for the selected manufacturer. Project targeted to be completed<br />
third quarter FY2016.<br />
• Completed an analysis of Metro’s communication systems’ backup battery power system<br />
to determine if the power architecture was sufficient to maintain the communication system<br />
during a major power outage. As a result of this analysis, procurement activities are<br />
underway to increase the capacity of the backup battery system by 50.0 percent. The power<br />
system upgrade is scheduled to be completed by third quarter FY2016.<br />
• Replaced the Rail Yard Tower and Block houses analog recording system with a new IP<br />
recording system that provides the ability to remotely monitor the availability and<br />
performance of the recording system. This enhancement enabled Metro to decommission<br />
the analog recording network.<br />
• Completed the upgrade of eight Network core routers to next generation routers that<br />
provide enhanced security features.<br />
• Deployed a new network timing architecture that will provide consistent time for all Metro<br />
operational systems.<br />
III-76