Washington Metropolitan Area Transit Authority<br />
Proposed <strong>FY2017</strong> Budget<br />
Chapter 3<br />
6. Developed preliminary implementation plan and reviewed with business stakeholders and<br />
IT/CCB representatives<br />
7. Finalized DDS for Phase II Bid/BidWeb for Daily Operations<br />
8. Begin initial review of DDS for Daily Crew, EPM (e.g., discipline), Self-Service, and<br />
Analytics<br />
9. Develop Phase II implementation strategy Spring 2016<br />
Regional Bus Stop Program<br />
Gathered requirements with the WMATA Office of Bus Planning and our regional partners to<br />
establish and maintain a Regional Bus Stop Database for the purposes of sharing and improving<br />
the data, increasing productivity and increasing accessibility. The first release of a mobile app<br />
called the Bus Stop Editor was developed for the WMATA Bus Planning department to conduct<br />
surveys of existing bus stops in the field. The next release of the bus Stop Editor will add<br />
functionality to establish, abolish and relocate stops, and to automate the generation of service<br />
change work orders. A utility will be developed to allow regional agencies to upload their data to<br />
the centralized database on an ongoing basis. A mobile and web application will also be developed<br />
for the public to view the accessibility of stops and provide comments, which will assist in<br />
accessibility improvements to bus stops.<br />
WMATA.COM Redesign Implementation<br />
FY2016 accomplishments include the design, development and implementation of our public<br />
website, WMATA.COM. A key objective of the redesign project is to provide a user-centric and<br />
re-architected web portal that will ensure compatibility across a variety of devices: desktop,<br />
mobile, tablets. (Currently, 58 percent of the traffic to WMATA.COM comes through mobile<br />
devices, and the number keeps growing.) The redesign project also includes implementation of a<br />
content management system (CMS) that allows internal content providers a more flexible platform<br />
for providing messaging and content to our customers. Trip planning and other way-finding tools<br />
are enhanced with “on-the-fly” mapping that can be saved or shared with others. Real-time alerts<br />
and other key traveling tools (Next Train, Next Bus) will be available from any page on the site.<br />
The ultimate goal is to improve customer interaction and communication through a more<br />
accessible and responsive website.<br />
IT Security<br />
The migration of users from RSA to Entrust which integrates with Active Directory provides an<br />
enterprise wide capability for federal mandates for MTPD CJIS requirement, VDI two factor<br />
capabilities, and multiple enhancements for stronger authentication throughout WMATA’s<br />
infrastructure. Previous tokens expired after 3 years with a recurring cost of $150 per user. New<br />
cost is $25 per token with an estimated savings to WMATA of $200K/year.<br />
Deployment of an enhanced security event and incident management (SEIM) platform which<br />
allows IT security to analyze and correlate all security events in WMATA’s network. The IT SOC<br />
team has the capacity for security event monitoring from PCI compliance and risk management to<br />
security intelligence and operations. The SEIM solution sifts through millions of log records and<br />
correlates them to find the critical events that matter in real time via dashboards, notifications, and<br />
reports. This capability improves the accuracy and prioritization of security risks and compliance<br />
issues authority wide.<br />