Washington Metropolitan Area Transit Authority<br />
Proposed <strong>FY2017</strong> Budget<br />
Chapter 3<br />
miles of Tamping. Completed rehabilitation of: 650' Floating Slabs, 2,520 Leaks, and 9,340<br />
Grout Pads.<br />
• CPDO - This office was established in September 2014 to better serve the needs of the overall<br />
Capital Improvement Projects for Infrastructure Renewal. CPDO is comprised of three<br />
different offices: Infrastructure Project Management, Infrastructure Construction Management<br />
and Track Access and Support Systems. These offices were developed through combining<br />
different departments throughout the Authority such as, the Program Management Office for<br />
Chief Engineer Infrastructure Services, Track and Structures Escort Support, Non-Revenue<br />
Track Allocations, Mobile Operations, Force Account Automatic Train Control Systems,<br />
Force Account/Project Group Power, IT and Plant Maintenance. CPDO supports the overall<br />
mission of WMATA to deliver high quality, safe, reliable and efficient transportation options<br />
throughout the Washington, D.C. Metro region by delivering Capital Projects within scope,<br />
schedule and budget.<br />
• MCAP - Completed construction of the MTPD District II Training Facility, which includes<br />
firing range and 152 parking slots. MCAP was also awarded the Design-Build contract for<br />
construction of the Southern Avenue Bus Garage replacement (new location: Andrews Federal<br />
Center) to Hensel Phelps Construction Company. The new facility will be a fully modern<br />
Leadership in Energy and Environmental Design (LEED) Silver facility that can hold 175<br />
buses. This contract also includes design and construction of mid-life overhaul facility,<br />
maintenance and service shop for non-revenue vehicles and bus engineering shop.<br />
• OPMS - Return to Work met with and counseled 485 employees related to their excessive<br />
absenteeism and successfully monitored them until their attendance became acceptable or until<br />
disciplinary action including termination was warranted. Return to Work placed and monitored<br />
the status of 264 Transitional Duty participants, in order to assist them in transitioning back in<br />
to a full duty working environment. Technical Skills Maintenance Training (TSMT) trained,<br />
refreshed and requalified over 6,000 employees in Roadway Worker Protection. TSMT has a<br />
total of 39 ELES Apprentices that are currently going through a 4-year training program to<br />
become certified WAMTA ELES Journeymen. ELES is incorporating new training techniques<br />
and utilizing new equipment to increase the practical experience that each student is receiving<br />
in the classroom and on the job. Enhancements in the training program through the use of the<br />
new equipment has proven to be an asset to increasing the value of each apprentice in the field.<br />
OPMS collaborated with OMBS to provide documentation and business processes that were<br />
critical in the Authority wide effort to validate capital labor draw downs in FY2015. OPMS<br />
has been working with Internal Compliance and Control to continually audit the Capital Time<br />
Sheet process and demonstrate compliance with federal regulations on capital funding.<br />
• SMNT - Completed 111.0 percent of their planned safety conversations, with 5,644.5 hours<br />
tallied over the course of 10,013 total conversations for the year. Injuries numbered just 13 in<br />
CY2014, nine less than CY2013 resulting in a 36.0 percent decrease. SMNT also ensured a<br />
successful launch of the Silver Line by working to make the Automatic Fare Collection,<br />
Automatic Train Control, Communications and Power systems safe and reliable for both<br />
passengers and employees. In addition, SMNT provided outstanding support for both the<br />
III-56