Washington Metropolitan Area Transit Authority<br />
Proposed <strong>FY2017</strong> Budget<br />
Chapter 3<br />
improved the ability of technicians to troubleshoot problems and make the necessary repairs.<br />
Thirty-seven units were rehabilitated or replaced as part of the modernization program.<br />
• TAMO - Facilitated the development of Transit Asset Management Plans for each asset class<br />
within WMATA in line with MAP-21 requirements. These plans create an alignment between<br />
the strategic goals of WMATA with decision making during each stage of an assets life-cycle.<br />
Developed and tested mobile application for assessing condition of assets as well as<br />
documenting maintenance activities. This application will be piloted in 2015. Established<br />
guidelines for capital expenditure evaluation, asset condition assessment and asset life-cycle<br />
cost.<br />
• CENV - Eight (8) 7000 Series railcars were delivered to WMATA and began design<br />
qualification tests. These tests include line clearance tests to make sure that the train fits<br />
through our tunnels and that the propulsion, braking and ATC systems meets our performance<br />
specifications. At the satisfactory conclusion of these tests, the train was put in simulated<br />
revenue service where the train is run in service without passengers.<br />
• PLNT - Achieved a 2.96 employee injury rate, which was better than the target of no more<br />
than more than 3.2 injuries per 200,000 work hours; Completed 12 major and 12 mini rehabs<br />
to restore the appearance of rail stations; renovated five (5) bus loop restroom/break room<br />
facilities; installed 140 emergency response ladders (12’ and 16” extension) at all underground<br />
rail stations; replaced 156 platform emergency end gates at 39 underground stations and<br />
upgraded four tunnel ventilation fan control systems and four drainage pumping station control<br />
systems (from pneumatic to PLC and Miltronics).<br />
• TIES AGM - Worked with SMNT Power to purchase and install 50 Multipurpose Relays on<br />
existing traction power line-ups. Eight (8) 7000 Series railcars were delivered to WMATA<br />
and began design qualification tests. Rail Fleet Reliability reached a 10-year high in 2014 as<br />
maintenance efforts enabled the deployment of 5.0 percent more railcars for Silver Line<br />
service. Escalator availability for CY2014 was 93.1 percent, the best delivered since 2010, as<br />
technicians repaired unexpected breakdowns more quickly than in prior years the<br />
modernization program improved the overall condition of the fleet.<br />
• CMNT - Rail Fleet Reliability reached a 10-year high in 2014 as maintenance efforts enabled<br />
the deployment of 5.0 percent more railcars for Silver Line service. Maintenance efforts<br />
resulted in railcars reliably traveling 20.0 percent more to service Silver Line stops while<br />
railcar delays increased only slightly.<br />
• QAAW - Implemented a Quality Assurance Inspection program for TIES. Collaborated with<br />
OMBS to establish a Capital Improvement Project (CIP) invoice review program – in response<br />
to the FTA’s 2014 Financial Management Oversight (FMO) review – ensuring CIP invoices<br />
submitted to the FTA for reimbursement include necessary substantiation and documentation<br />
for lawful and proper payment. Supported Commissioning and Testing of the Pilot 7000 Series<br />
Railcars, and First Article Inspections (FAI) for Sub-Components, Pilot Car, Production Shell<br />
and Car.<br />
• TRST - Completed installation of 44 Yard Switches, 15,199 Cross-Ties, 15.7 miles of Running<br />
Rail, 28,207 Fasteners, 836 open joints welded, 1,799 ROW Signage Replacement and 51.1<br />
III-55