08.05.2016 Views

FY2017 PROPOSED BUDGET

FY2017%20Proposed%20Budget

FY2017%20Proposed%20Budget

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WMATA <strong>FY2017</strong> Capital Project Summary<br />

CIP0136 Radio & Cellular Infrastructure Renewal Project<br />

Project Description<br />

This project will replace the existing WMATA<br />

Comprehensive Radio Communications System (CRCS)<br />

operating in 450‐490 MHz frequency band (also referred to<br />

as T‐Band) with a new system operating in the 700 MHz<br />

band, as required by the new Federal Communications<br />

Commission (FCC) T‐Band relocation requirement that<br />

affects the agency's Ultra High Frequency radio system. This<br />

project also maintains the current CRCS in working order<br />

until the frequencies are secured and replaced.<br />

Deliverables<br />

1) Complete construction of JGB ROCC & BOCC<br />

improvements<br />

2) Complete DAS cable tray and cable installation for both<br />

700 / 800 MHz Radio and Neutral Host on Red Line<br />

3) Begin construction 700MHz / 800MHz Metro Box<br />

Enclosures<br />

4) Complete design of above ground radio system.<br />

Proposed <strong>FY2017</strong> Budget<br />

Appendix A<br />

Financial Summary<br />

$100,000,000<br />

$80,000,000<br />

$60,000,000<br />

$40,000,000<br />

$20,000,000<br />

$0<br />

Milestones<br />

1) JGB and ROCC improvements completed<br />

2) Cable trays completed on Red Line<br />

3) Design work for above ground implementation completed<br />

FY2016<br />

<strong>FY2017</strong><br />

FY2018<br />

FY2019<br />

FY2020<br />

FY2021<br />

FY2022<br />

Project Financials<br />

FY2016 ‐ FY2011 ‐<br />

Budget (in 000s) FY11‐FY15 FY2016 <strong>FY2017</strong> FY2018 FY2019 FY2020 FY2021 FY2022 FY2022 FY2022<br />

PPersonnel 1,136 2,563 4,785 4,713 5,570 5,112 4,871 5,050 32,664 33,800<br />

NNon‐Personnel 6,234 7,497 40,215 61,211 83,459 53,731 27,796 20,475 294,384 300,618<br />

Total Budget 7,370 10,060 45,000 65,924 89,030 58,843 32,667 25,525 327,048 334,418<br />

Planned Funding Sources<br />

As of 12/16/2015<br />

<strong>FY2017</strong><br />

Original<br />

FY11‐FY16<br />

Cost<br />

Current<br />

FY11 ‐ FY16<br />

Cost<br />

Variance Analysis<br />

No significant change in FY2011‐FY2016<br />

time period. Substantial investment in<br />

<strong>FY2017</strong>‐FY2022.<br />

NPRIIA<br />

45,000<br />

Total 45,000<br />

20,797 17,594<br />

A-75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!