Project Description<br />

WMATA <strong>FY2017</strong> Capital Project Summary<br />

CIP0021 Track Grout Pad Rehabilitation<br />

This project rehabilitates the grout pads that support the<br />

track structure. Metro has an inventory of approximately<br />

160 miles (844,800 linear feet) of grout pads. Sections of<br />

track structure often require rehabilitation in conjunction<br />

with new fasteners, switches and switch machines. Grout<br />

pads on aerial structures and outside locations are repaired<br />

from spring through fall, while grout pads are repaired in<br />

tunnels during the winter months. The grout pads provide<br />

elevation and support for the running rails and are the main<br />

support for the rail fasteners, which maintain track<br />

geometry, cross‐level and gauge.<br />

Deliverables<br />

Proposed <strong>FY2017</strong> Budget<br />

Appendix A<br />

1) Replace 8,000 linear feet of grout pads annually and<br />

procure cement material<br />

Financial Summary<br />

$6,000,000<br />

$5,000,000<br />

$4,000,000<br />

$3,000,000<br />

$2,000,000<br />

$1,000,000<br />

$0<br />

Milestones<br />

1) This is an on‐going program with an annual goal of 8,000<br />

linear feet of grout pads replacement<br />

FY2016<br />

<strong>FY2017</strong><br />

FY2018<br />

FY2019<br />

FY2020<br />

FY2021<br />

FY2022<br />

Project Financials<br />

FY2016 ‐ FY2011 ‐<br />

Budget (in 000s) FY11‐FY15 FY2016 <strong>FY2017</strong> FY2018 FY2019 FY2020 FY2021 FY2022 FY2022 FY2022<br />

PPersonnel 11,830 2,729 2,723 3,773 3,970 4,178 4,398 4,631 26,403 38,232<br />

NNon‐Personnel 1,023 99 82 113 119 125 131 138 806 1,829<br />

Total Budget 12,853 2,828 2,805 3,886 4,089 4,303 4,529 4,768 27,208 40,061<br />

Planned Funding Sources<br />

As of 12/16/2015<br />

<strong>FY2017</strong><br />

Original<br />

FY11‐FY16<br />

Cost<br />

Current<br />

FY11 ‐ FY16<br />

Cost<br />

Variance Analysis<br />

No significant change.<br />

NPRIIA<br />

2,805<br />

Total 2,805<br />

15,716 15,682<br />