Washington Metropolitan Area Transit Authority<br />

Proposed Fiscal Year 2017 Budget<br />

Chapter 1<br />

system, as well as the development of an automated recording process which addresses<br />

maintenance and inspection activities on critical systems within the tunnels.<br />

o The Radio & Cellular Infrastructure Renewal project which is planned to complete the<br />

design work for the above ground elements of the new 700 mhz radio system and<br />

complete installation of cable trays along the Red Line in <strong>FY2017</strong>.<br />

o Railcar, Bus, and Access Vehicle Replacement which will continue in <strong>FY2017</strong> with<br />

the replacement of three hundred 1000-series railcars with the new 7000-series. Metro<br />

will also advance a MetroAccess vehicle procurement as well as the rehabilitation and<br />

replacement of the bus fleet.<br />

o The Track and Structures Rehabilitation program will continue to renew and replace<br />

crossties, running rail, fasteners, switches, and insulators as part of the effort to<br />

maintain a state of good repair on the system, resulting in the prevention of service<br />

delays and speed restriction.<br />

o The Transit Signal Priority project which will lead to faster Metrobus service by<br />

identifying key corridors where changes could be made to potentially increase bus<br />

speeds by twenty percent.<br />

o The Rail Power System Rehabilitation programs which will address the replacement of<br />

power system components and control rooms that are nearing the end of their useful<br />

life such as cabling, track circuits, junction boxes, switchgear, and transformers<br />

throughout the rail systems and yards.<br />

o The Replacement of Bus Garages with new modern facilities at Andrews Federal<br />

Campus and Cinder Bed Road.<br />

o The Escalator and Elevator Rehabilitation and Replacement program will continue with<br />

the replacement of twenty two escalators and rehabilitation of another ten escalators<br />

and fifteen elevators.<br />