08.05.2016 Views

FY2017 PROPOSED BUDGET

FY2017%20Proposed%20Budget

FY2017%20Proposed%20Budget

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WMATA <strong>FY2017</strong> Capital Project Summary<br />

CIP0139_S10 Tunnel Ventilation System Assessment<br />

Project Description<br />

WMATA’s existing tunnel ventilation system was designed<br />

and installed before modern fire/life safety standards were<br />

issued for the rail transit environment. With growing<br />

passenger loads and eight‐car trains, WMATA must look for<br />

opportunities to improve ventilation performance and<br />

capacity. This project addresses FTA SMI R‐6‐38‐a<br />

Deliverables<br />

1) Develop final analysis report reviewing Action plan<br />

resulting from ventilation improvement study. Perform<br />

scope verification to ensure all issues are<br />

addressed<br />

Proposed <strong>FY2017</strong> Budget<br />

Appendix A<br />

Financial Summary<br />

$300,000<br />

$250,000<br />

$200,000<br />

$150,000<br />

$100,000<br />

$50,000<br />

$0<br />

Milestones<br />

1) Award contract by Q2 <strong>FY2017</strong> and begin construction.<br />

Install 72 control panels total<br />

2) Complete evaluation and training strategy initiatives for<br />

employee training and operations safety.<br />

FY2016<br />

<strong>FY2017</strong><br />

FY2018<br />

FY2019<br />

FY2020<br />

FY2021<br />

FY2022<br />

Project Financials<br />

FY2016 ‐ FY2011 ‐<br />

Budget (in 000s) FY11‐FY15 FY2016 <strong>FY2017</strong> FY2018 FY2019 FY2020 FY2021 FY2022 FY2022 FY2022<br />

PPersonnel 0 79 0 0 0 0 0 0 79 79<br />

NNon‐Personnel 0 169 0 0 0 0 0 0 169 169<br />

Total Budget 0 248 0 0 0 0 0 0 248 248<br />

Planned Funding Sources<br />

As of 12/16/2015<br />

<strong>FY2017</strong><br />

Original<br />

FY11‐FY16<br />

Cost<br />

Current<br />

FY11 ‐ FY16<br />

Cost<br />

Variance Analysis<br />

Project initiated in FY2016<br />

Total 0<br />

248 248<br />

A-80

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!