Washington Metropolitan Area Transit Authority<br />

Proposed <strong>FY2017</strong> Budget<br />

Chapter 3<br />

Uses of Funds<br />

Total personnel expenses make up the largest portion of the Metrobus budget. For <strong>FY2017</strong>,<br />

personnel cost is estimated at $526.1 million or 80.1 percent of the Metrobus budget, which<br />

represents an increase of $18.4 million over the FY2016 budget. This increase reflects committed<br />

wage and benefit growth, additional staffing for the FTA mandated safety corrective actions and<br />

accounts for the revised method for allocation of indirect costs. This increase is partially offset by<br />

the transfer of preventive maintenance costs to the CIP.<br />

Services are budgeted at $44.6 million, which is $7.0 million greater than the FY2016 budget. The<br />

increase reflects projected inflation associated with camera maintenance and voice technology<br />

solution services in support of Metrobus, as well as increases due to the revised method of<br />

allocating indirect costs. Materials and Supplies are budgeted at $38.5 million, which is $2.6<br />

million more than the FY2016 budget. The increase aligns the budget to address historical material<br />

utilization to maintain buses. Energy costs, which include diesel, Clean Natural Gas (CNG),<br />

gasoline, and utilities, are budgeted at $46.8 million. This amount is $8.1 million greater than<br />

FY2016 primarily due to the revised method of allocating indirect costs. The increase is offset by<br />

service level reductions of 4.5 million trips and lower fuel costs. Other expenses proposed for<br />

Metrobus total $0.8 million, a decrease of $13.7 million over the FY2016 budget primarily due to<br />

the updated cost allocation methodology.<br />

Materials &<br />

Supplies,<br />

$38.5m<br />

Services,<br />

$44.6m<br />

USES OF FUNDS $656.8M<br />

Energy,<br />

$46.8m<br />

Other, $0.8m<br />

Personnel,<br />

$526.1m<br />

Note: Excludes operating reimbursable projects and debt service.<br />

III-11