Project Description<br />

WMATA <strong>FY2017</strong> Capital Project Summary<br />

CIP0011 Underground Storage Tank Replacement<br />

This project designs and constructs the replacement of<br />

underground storage tank (UST) systems, above ground<br />

storage tank (AST) systems and tank monitoring systems at<br />

or near the end of their warranty periods. In addition, this<br />

project rehabilitates the tank systems that are at mid‐life to<br />

minimize potential liabilities.<br />

Deliverables<br />

Proposed <strong>FY2017</strong> Budget<br />

Appendix A<br />

1) Remove Service Vehicle Maintenance tanks and abandon<br />

monitoring wells at Carmen Turner Facility September 2016.<br />

New contract for Forest Glen<br />

2) Replace 4 Underground Storage Tanks (USTs), 3 Above<br />

Ground Storage Tanks (ASTs). New contract for Forest Glen<br />

3) Replace used oil AST at West Falls Church December 2016<br />

4) Replace used oil AST at Shady Grove (June 2017). Install<br />

Diesel Exhaust Fluid (DEF) tank at Alexandria September<br />

2017<br />

Financial Summary<br />

$8,000,000<br />

Milestones<br />

1) Forest Glen contract to be issued in <strong>FY2017</strong><br />

$6,000,000<br />

$4,000,000<br />

$2,000,000<br />

$0<br />

FY2016<br />

<strong>FY2017</strong><br />

FY2018<br />

FY2019<br />

FY2020<br />

FY2021<br />

FY2022<br />

Project Financials<br />

FY2016 ‐ FY2011 ‐<br />

Budget (in 000s) FY11‐FY15 FY2016 <strong>FY2017</strong> FY2018 FY2019 FY2020 FY2021 FY2022 FY2022 FY2022<br />

PPersonnel 1,720 491 236 542 355 529 539 538 3,230 4,951<br />

NNon‐Personnel 11,503 1,761 2,074 5,319 3,906 5,374 4,455 3,631 26,521 38,024<br />

Total Budget 13,224 2,252 2,310 5,862 4,262 5,903 4,994 4,169 29,751 42,975<br />

Planned Funding Sources<br />

As of 12/16/2015<br />

<strong>FY2017</strong><br />

Original<br />

FY11‐FY16<br />

Cost<br />

Current<br />

FY11 ‐ FY16<br />

Cost<br />

Variance Analysis<br />

No significant change.<br />

NState of Good Repair<br />

2,310<br />

Total 2,310<br />

15,435 15,479<br />