Project Description<br />

WMATA <strong>FY2017</strong> Capital Project Summary<br />

CIP0108 Red Line Rehabilitation Stage Two<br />

This project is the second stage of a comprehensive<br />

rehabilitation of the Red Line and will focus on rebuilding<br />

systems and infrastructure. Work will be divided into<br />

smaller phases and awarded separately. The first phase will<br />

include: Waterproofing at the Medical Center crossover,<br />

tunnel rehabilitation and station ceiling replacement at<br />

Medical Center, retrofitting of the Grosvenor aerial<br />

structure, tile and platform rehabilitation and roof retrofit<br />

at Grosvenor‐Strathmore, and a new south mezzanine at<br />

Bethesda. Additional phases being planned to extend<br />

beyond FY2022.<br />

Deliverables<br />

Proposed <strong>FY2017</strong> Budget<br />

Appendix A<br />

1) Complete design and award contract for waterproofing at<br />

the Medical Center crossover<br />

2) Complete design for tile and platform rehabilitation, as<br />

well as canopy and mezzanine roof retrofit at Grosvenor‐<br />

Strathmore<br />

3) Design tunnel rehabilitation and station ceiling<br />

replacement at Medical Center<br />

4) Finish design for new south mezzanine at Bethesda.<br />

Financial Summary<br />

$30,000,000<br />

$25,000,000<br />

$20,000,000<br />

$15,000,000<br />

$10,000,000<br />

$5,000,000<br />

$0<br />

Milestones<br />

1) Award the contract for the first phase and finalize a cost<br />

loaded schedule (<strong>FY2017</strong>)<br />

FY2016<br />

<strong>FY2017</strong><br />

FY2018<br />

FY2019<br />

FY2020<br />

FY2021<br />

FY2022<br />

Project Financials<br />

FY2016 ‐ FY2011 ‐<br />

Budget (in 000s) FY11‐FY15 FY2016 <strong>FY2017</strong> FY2018 FY2019 FY2020 FY2021 FY2022 FY2022 FY2022<br />

PPersonnel 1,953 1,795 3,326 6,053 2,646 2,722 2,749 9,097 28,389 30,342<br />

NNon‐Personnel 5,074 3,205 6,674 11,441 6,807 7,840 8,203 17,440 61,611 66,685<br />

Total Budget 7,027 5,000 10,000 17,494 9,453 10,562 10,953 26,537 90,000 97,027<br />

Planned Funding Sources<br />

As of 12/16/2015<br />

<strong>FY2017</strong><br />

NState of Good Repair<br />

6,202<br />

NLocal<br />

3,798<br />

Total 10,000<br />

Original<br />

FY11‐FY16<br />

Cost<br />

Current<br />

FY11 ‐ FY16<br />

Cost<br />

144,622 12,198<br />

Variance Analysis<br />

Red Line Stage Two contract was<br />

originally planned to begin in FY2014,<br />

however the project was delayed as<br />

lessons learned from the stage one<br />

contract were evaluated<br />