Project Description<br />

WMATA <strong>FY2017</strong> Capital Project Summary<br />

CIP0026 Station/Tunnel Leak Mitigation<br />

Station Tunnel Leak Mitigation eliminates unsafe conditions<br />

created by water leaks for Metrorail passengers and<br />

employees and also prevents service delays resulting from<br />

water intrusion. This project restores the structural integrity<br />

of tunnel liners, prevents leaks, eliminates stray currents<br />

and reduces corrosion of wayside equipment and track<br />

components. In addition, drainage improvements will be<br />

implemented to allow water to properly train from the<br />

track bed.<br />

Deliverables<br />

1) Eliminate 2,750 tunnel leaks<br />

2 ) Rehabilitate 210,000 linear feet of drainage<br />

3) Procure leak repair material and equipment<br />

Proposed <strong>FY2017</strong> Budget<br />

Appendix A<br />

Financial Summary<br />

$12,000,000<br />

$10,000,000<br />

$8,000,000<br />

$6,000,000<br />

$4,000,000<br />

$2,000,000<br />

$0<br />

Milestones<br />

1) This is an on‐going program to correct station and tunnel<br />

leaks throughout the Metrorail system.<br />

FY2016<br />

<strong>FY2017</strong><br />

FY2018<br />

FY2019<br />

FY2020<br />

FY2021<br />

FY2022<br />

Project Financials<br />

FY2016 ‐ FY2011 ‐<br />

Budget (in 000s) FY11‐FY15 FY2016 <strong>FY2017</strong> FY2018 FY2019 FY2020 FY2021 FY2022 FY2022 FY2022<br />

PPersonnel 14,638 5,936 4,865 8,167 8,608 9,075 9,568 10,828 57,048 71,686<br />

NNon‐Personnel 1,385 22 2,235 1,853 16 17 17 19 4,180 5,565<br />

Total Budget 16,023 5,958 7,100 10,019 8,625 9,092 9,586 10,847 61,228 77,250<br />

Planned Funding Sources<br />

As of 12/16/2015<br />

<strong>FY2017</strong><br />

Original<br />

FY11‐FY16<br />

Cost<br />

Current<br />

FY11 ‐ FY16<br />

Cost<br />

Variance Analysis<br />

Increased project scope and delivery<br />

schedule to address outstanding water<br />

intrusion issues.<br />

NPRIIA<br />

7,100<br />

Total 7,100<br />

20,451 22,256<br />