LIST OF NTPC COMMISSIONED STATIONS/PROJECTS<br />

I. COAL BASED PROJECTS<br />

S.No. Project State Installed Capacity (MW)<br />

1. Singrauli I & II UP 2000<br />

2. Korba I & II Chhattisgarh 2100<br />

3. Ramagundam I, II & III AP 2600<br />

4. Farakka-I & II WB 1600<br />

5. Vindhyachal-I, II & III MP 3260<br />

6. Rihand-I & II UP 2000<br />

7. Kahalgaon-I & II* Bihar 1340<br />

8. NCTPP-I UP 840<br />

9. Talcher I & II Orissa 3000<br />

10. Talcher TPS Orissa 460<br />

11. Unchahar-I, II & III UP 1050<br />

12. Simhadri AP 1000<br />

13. Tanda TPS UP 440<br />

14. Badarpur Delhi 705<br />

15. Sipat-II** Chattisgarh 500<br />

Total (Coal) 22895<br />

* Two more 500 MW units <strong>of</strong> Stage-II under construction.<br />

** One more 500 MW unit <strong>of</strong> Stage-II under construction. 1980 MW Stage-I also under construction<br />

II. COMBINED CYCLE GAS/ LIQUID FUEL BASED PROJECTS<br />

S.No. Project State Installed Capacity (MW)<br />

1. Auraiya-I UP 652<br />

2. Anta-I Rajasthan 413<br />

3. Kawas-I Gujarat 645<br />

4. Dadri UP 817<br />

5. Jhanor-Gandhar-I Gujarat 648<br />

6. RGCCPP Kayamkulam-I Kerala 350<br />

7. Faridabad Haryana 430<br />

Total (Gas) 3955<br />

III. POWER PROJECTS UNDER JOINT VENTURES<br />

S.No. Project (JV) State Installed Capacity (MW)<br />

1. Rourkela (NSPCL) Orissa 120<br />

2. Durgapur (NSPCL) West Bengal 120<br />

3. Bhilai (NSPCL) Chhattisgarh 74<br />

4 Ratnagiri (RGPPL) Maharashtra 1480<br />

Total (under JVs ) 1794<br />

GRAND TOTAL (Coal + Gas + Hydro) 28644<br />