MoP - Ministry of Power
MoP - Ministry of Power
MoP - Ministry of Power
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
A view <strong>of</strong> NTPC Gas <strong>Power</strong> Project at Jhanor - Gandhar (648 MW), Gujarat<br />
Rajasthan, Madhya Pradesh, Maharastra, Chhattisgarh,<br />
Jharkhand, Andhra Pradesh, Karnataka, Tamil Nadu and<br />
Kerala.<br />
- Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY)<br />
to make available the project management expertise &<br />
capabilities to the states from the following three options:<br />
i) Project formulation, development & implementation<br />
involving system planning, design, engineering &<br />
procurement <strong>of</strong> goods and services and construct/<br />
implement/ commission <strong>of</strong> projects covered under program.<br />
ii) Formulation and preparation <strong>of</strong> reports, project<br />
approvals, advisory support for procurement and project<br />
monitoring and supervision <strong>of</strong> quality <strong>of</strong> work.<br />
iii) Project monitoring and supervision <strong>of</strong> quality <strong>of</strong> work<br />
during construction.<br />
Under RGGVY, NESCL is carrying out the execution <strong>of</strong> rural<br />
electrification works on turnkey basis in the states <strong>of</strong><br />
Chhattisgarh, Jharkhand, Orissa, Madhya Pradesh, West<br />
Bengal, Kerala and UT Lakshadweep. In addition post award<br />
consultancy assignment are also being carried out for the<br />
project monitoring and supervision <strong>of</strong> quality <strong>of</strong> work during<br />
construction in the states <strong>of</strong> Uttarakhand, Madhya Pradesh<br />
and Karnataka.<br />
Gross Revenue <strong>of</strong> the Company for the year 2006-07 is<br />
Rs. 20.70 Crs and the pr<strong>of</strong>it after tax <strong>of</strong> the company for the<br />
year is Rs 2.93 Crs.<br />
7.6.3 NTPC Hydro Ltd. (NHL)<br />
NTPC has formed a wholly owned subsidiary company on<br />
12.12.2002 with an objective to develop small and medium<br />
hydro electric power projects up to 250 MW capacities.<br />
Presently, company is implementing two projects namely,<br />
Lata Tapovan Hydro Electric Project (171 MW capacity) in<br />
the state <strong>of</strong> Uttarakhand and Rammam Hydro Electric<br />
Project, Stage-III (120 MW capacity) in the states <strong>of</strong> West<br />
Bengal and Sikkim. In respect <strong>of</strong> Lata Tapovan HEP, all<br />
statutory clearances including Techno-economic and<br />
Environmental clearances have been obtained, majority <strong>of</strong><br />
land has been acquired and EPC package is under award<br />
process. With regard to Rammam HEP Stage-III, majority<br />
<strong>of</strong> statutory clearances including Techno-economic and<br />
Environmental clearances have been obtained and balance<br />
statutory clearances are under process. Further, land<br />
acquisition and infrastructure development activities are<br />
under process. Both the projects are scheduled to be<br />
commissioned in early part <strong>of</strong> XII Plan.<br />
7.6.4 Vaishali <strong>Power</strong> Generating Company Limited<br />
A subsidiary company named “Vaishali <strong>Power</strong> Generating<br />
Company Ltd.” was incorporated on 06.09.2006 with Bihar<br />
89