100<br />
Note:<br />
1. Capacity Index up to the month <strong>of</strong> Nov'07 is<br />
provisional.<br />
2. The anticipated C.I has been calculated considering<br />
the maintenance period <strong>of</strong> ROR with pondage type<br />
stations and " GOOD RATING" <strong>of</strong> the MOU for the<br />
PROJECTS UNDER CONSTRUCTION<br />
year 2007-08 <strong>of</strong> the ROR type stations.<br />
3. The COD <strong>of</strong> the first, second and third unit <strong>of</strong> the<br />
Teesta-V project has been taken as Jan'2008,<br />
Feb'2008 and March'2008 respectively.<br />
4. * Teesta-V not commissioned<br />
The Corporation is presently engaged in the construction <strong>of</strong> the following hydro projects: -<br />
S.No. Name <strong>of</strong> the Project State/ UT/ Country Installed Capacity (MW)<br />
1. TEESTA-V Sikkim 510<br />
2. PARBATI-II H.P. 800<br />
3. SEWA – II J&K 120<br />
4. SUBANSIRI LOWER Ar. Pradesh 2000<br />
5. TEESTA LOW DAM-III West Bengal 132<br />
6. URI-II J&K 240<br />
7. CHAMERA-III H.P. 231<br />
8. TEESTA LOW DAM-IV West Bengal 160<br />
9. PARBATI-III H.P. 520<br />
10. NIMOO BAZGO J&K 45<br />
11. CHUTAK J&K 44<br />
12. KISHANGANGA J&K 330<br />
Total 5132<br />
2000 MW Subansiri Lower Project (Arunachal Pradesh)-<strong>Power</strong> House Pit Excavation in progress.