NORTH EASTERN ELECTRIC POWER<br />
CORPORATION LTD.<br />
North Eastern Electric <strong>Power</strong> Corporation Ltd. (NEEPCO)<br />
was constituted in 1976 under the Indian Companies Act,<br />
1956 with the objective <strong>of</strong> developing the power potential <strong>of</strong><br />
the North Eastern Region <strong>of</strong> the country through planned<br />
development <strong>of</strong> power generation projects, which in turn would<br />
effectively promote the development <strong>of</strong> the North Eastern<br />
Region. Since then NEEPCO has grown into one <strong>of</strong> the<br />
pioneer Public Sector Undertaking under the <strong>Ministry</strong> <strong>of</strong><br />
<strong>Power</strong>, Govt. <strong>of</strong> India, with an authorized share capital <strong>of</strong><br />
Rs. 3,500 Crores. and having an installed capacity <strong>of</strong> 1,130<br />
MW (755 MW hydro & 375 MW thermal), which meets more<br />
1. POWER STATIONS UNDER OPERATION:<br />
The following completed Projects are under Operation:<br />
than 60% <strong>of</strong> the energy requirements <strong>of</strong> the N.E. Region.<br />
The main objectives <strong>of</strong> the Corporation are to add to the power<br />
generating capacity in the North Eastern Region by ensuring<br />
optimum utilization <strong>of</strong> commissioned generation projects, to<br />
generate adequate internal resources ensuring justifiable<br />
return on investment, to continue sustained efforts to obtain<br />
the receivables from State Electricity Boards/Departments,<br />
to execute and commission power projects, both hydro and<br />
thermal, within prescribed time frames, and to undertake long<br />
term feasibility studies for optimum development <strong>of</strong> hydro<br />
power resources <strong>of</strong> the North Eastern Region.<br />
Sl. No. Name <strong>of</strong> Project State Installed Capacity<br />
(A) HYDRO<br />
1 Kopili H.E. <strong>Power</strong> Plant Assam 275 MW<br />
2 Doyang H.E. <strong>Power</strong> Plant Nagaland 75 MW<br />
3 Ranganadi H.E. <strong>Power</strong> Plant Arunachal Pradesh 405 MW<br />
Sub-Total (A): 755 MW<br />
(B) THERMAL:<br />
4 Assam Gas Based <strong>Power</strong> Plant Assam 291 MW<br />
5 Agartala Gas Turbine <strong>Power</strong> Plant Tripura 84 MW<br />
Sub Total (B): 375 MW<br />
TOTAL: 1,130 MW<br />
2. GENERATION FROM POWER STATIONS:<br />
CHAPTER - 22.6<br />
Sl. No. Name <strong>of</strong> the MOU Target Actual Generation Balance<br />
<strong>Power</strong> Stations during 2007-08 upto 30th Nov’ ‘07 Targets upto<br />
30.11.2007<br />
(A) HYDRO<br />
Kopili H.E. <strong>Power</strong> Plant<br />
(275 MW), Assam. 1550 MU 1017 MU 533 MU<br />
Doyang H.E. <strong>Power</strong> Plant<br />
(75 MW), Nagaland. 227 MU 241 MU Targets already<br />
achieved<br />
143