114<br />

Rs 24,888 Crore at the end <strong>of</strong> last financial year. The Return<br />

on Net Worth for the company was at 11.50% in 2006-07,<br />

creating significant value for the shareholders.<br />

The company undertook capital investment <strong>of</strong> Rs. 6,383<br />

Crore during the financial year 2006-07 and the required<br />

funds were tied up from internal resources, bonds/term loan<br />

from the domestic sources, grant from Government <strong>of</strong> India<br />

and ECB/Supplier’s Credit. POWERGRID continued to<br />

implement its projects with economy and within stipulated<br />

time frame to derive maximum economic benefits. Its<br />

advanced and cost effective Integrated Project Management<br />

and Control System (IPMCS) for total project review and<br />

perpetual monitoring, has contributed significantly.<br />

Recently, Company entered the capital market with an IPO<br />

<strong>of</strong> 573.9 million equity shares <strong>of</strong> Rs. 10 each. The issue<br />

closed with responses from both domestic and global<br />

investors that surpassed the most optimistic expectations.<br />

Overall, the issue was subscribed 64 times; the institutional<br />

investors segment - 116 times and the high-net worth<br />

individuals - 41 times. The global enthusiasm for the issue<br />

($30 billion in bids) has particularly been historic. This<br />

tremendous response shows the growth potential <strong>of</strong> the<br />

Corporation and the faith <strong>of</strong> people/investors in the Indian<br />

<strong>Power</strong> Sector in general and Corporation in particular.<br />

In the year 2007 upto November 2007, POWERGRID has<br />

commissioned about 3691 Ckm. <strong>of</strong> transmission lines,<br />

06 new sub-stations and has added transformation<br />

capacity <strong>of</strong> about 5980 MVA. Major projects commissioned<br />

include: Kahalgaon–II (Phase-I) Transmission System,<br />

Northern Region System Strengthening Scheme-I,<br />

Unchahar–III Transmission System, Vindhyachal-Korba<br />

Transmission Line, Bina – Nagda Transmission Line,<br />

Vindhyachal–III Transmission System & System<br />

Strengthening–III <strong>of</strong> Southern Region.<br />

BUSINESS DEVELOPMENT<br />

POWERGRID, an ISO 9001 certified company, has acquired<br />

in-house expertise at par with global standards in the field<br />

<strong>of</strong> Planning, Engineering, Load Despatch and<br />

Communication, Telecommunication, Contracting, Financial<br />

and Project Management. POWERGRID is executing<br />

various consultancy assignments in these areas as a part<br />

<strong>of</strong> its Business Development Activity. During the year 2007-<br />

08, POWERGRID has secured 20 nos. <strong>of</strong> new consultancy<br />

assignments with a project cost (including POWERGRID<br />

consultancy fee) <strong>of</strong> about Rs. 2,000 Crore (upto Nov., 07).<br />

The Company has realised consultancy fee <strong>of</strong> Rs. 111 Crore<br />

(upto Nov., 07) from its ongoing consultancy projects.<br />

POWERGRID’s first International Consultancy Contract with<br />

Bhutan Telecom for establishment <strong>of</strong> OPGW system on<br />

turnkey basis in the Royal Kingdom <strong>of</strong> Bhutan was<br />

successfully completed on schedule. All other ongoing<br />

consultancy assignments are progressing ahead <strong>of</strong><br />

schedule.<br />

As a result <strong>of</strong> on-going initiatives being undertaken in<br />

POWERGRID to make its presence felt internationally in<br />

dealing with all facets <strong>of</strong> power system, POWERGRID in<br />

association with M/s Sigma Enterprises-a Dubai based Co.<br />

has recently secured the prestigious international<br />

Consultancy assignment against stiff competition from Dubai<br />

Electricity & Water Authority (DEWA) for providing<br />

Engineering Consultancy Services for 2 nos. 400kV GIS<br />

Sub-stations and associated Overhead Transmission<br />

Lines. Scope <strong>of</strong> consultancy includes all activities viz. design,<br />

planning, engineering, EIA studies, preparation <strong>of</strong> tender<br />

documents, evaluation, assistance in pre-award discussions<br />

& negotiations, preparation <strong>of</strong> award letters, inspection and<br />

witnessing <strong>of</strong> type testing, site supervision, project<br />

management, payment certification and resolution <strong>of</strong> corridor<br />

and outage requirement and co ordinate for approval from<br />

various concerned authorities in Dubai.<br />

Consolidating its position in Afghanistan, POWERGRID has<br />

recently bagged following two consultancy assignments in<br />

Afghanistan against stiff competition from other international<br />

consultants:<br />

a. (a) Consultancy to AEAI (Advance Engineering<br />

Associates International, inc) for Engineering design<br />

and environmental assessment services for<br />

Sheberghan – Mazhar – Naibabad Transmission<br />

Line funded by USAID with POWERGRID’s<br />

consultancy fee <strong>of</strong> USD 3,00,000. Scope <strong>of</strong> Services<br />

include walk over survey and finalize alignment;<br />

Identification <strong>of</strong> suitable sites for 500/220 kV substation<br />

and general layout and location <strong>of</strong> substation to be<br />

provided; Assessment <strong>of</strong> Demining/ROW needs;<br />

Engineering and Environmental Assessment<br />

b. (b) Consultancy to MEW for 220/20 kV Aybak<br />

Substation and Bay Expansion work <strong>of</strong> Mazhar-e-<br />

Sharif Substation funded by World Bank for a<br />

consultancy fee <strong>of</strong> USD 98,000. Scope <strong>of</strong> Services<br />

include Complete Design, Engineering, preparation <strong>of</strong><br />

Bidding documents, assistance to MEW during Bid<br />

Clarifications, and Complete Bid Evaluation <strong>of</strong> Aybak<br />

220/20kv Substation and Bay Expansion work <strong>of</strong><br />

Mazhar-e-Sharif Substation<br />

These projects have strengthened Indian presence and<br />

involvement in the reconstruction process in Afghanistan<br />

and have also enhanced international pr<strong>of</strong>ile <strong>of</strong><br />

POWERGRID.<br />

On Domestic Front also, some <strong>of</strong> the major assignments<br />

secured (up to November 2007) by POWERGRID are as<br />

detailed below :<br />

Quadripartite agreement signed amongst <strong>Ministry</strong> <strong>of</strong><br />

<strong>Power</strong>, Govt. <strong>of</strong> Bihar, Bihar State Electricity Board<br />

and POWERGRID for Consultancy work <strong>of</strong><br />

strengthening <strong>of</strong> sub-transmission scheme under<br />

Phase II, Part II. The estimated project cost is<br />

Rs. 1240.86 Crore.