5-6. Tawang-I & II (1500 MW), Arunachal Pradesh:<br />

Revised MOA between NHPC and Govt. <strong>of</strong> Arunachal<br />

Pradesh has been signed on 24.6.07 for executing the<br />

project on ownership basis by NHPC. This MOA<br />

supercedes the earlier MOA signed on 21.9.06. MOEF has<br />

accorded clearance for pre-construction activities and<br />

approval <strong>of</strong> terms <strong>of</strong> reference for undertaking the EIA<br />

studies for Tawang-I&II. NHPC submitted the PFRs <strong>of</strong> both<br />

the projects to CEA for establishing the commercial viability.<br />

EIA & EMP studies have been awarded on 19.6.07. S&I<br />

are under progress for preparation <strong>of</strong> DPR<br />

7-8. Subansiri Middle (1600 MW) and Upper (2000<br />

MW), Arunachal Pradesh:<br />

CEA had advised NHPC to prepare DPR and take up<br />

essential infrastructure works. Proposal for Site Clearance<br />

Stage-II was submitted to MOEF on 26.09.02. MOEF vide<br />

letter dt 19.6.03 rejected the site clearance on the basis <strong>of</strong><br />

recommendation <strong>of</strong> IBWL in case <strong>of</strong> Lower Subansiri<br />

Project that “there will be no construction <strong>of</strong> dam upstream<br />

<strong>of</strong> Subansiri river in future”. While disposing appeal filed<br />

against Subansiri Lower Project, Supreme Court vide its<br />

order dated 19.4.04 has directed that permission for<br />

Subansiri Lower Project may be given subject to fulfillment<br />

R&D ACTIVITIES<br />

<strong>of</strong> condition imposed by Standing Committee <strong>of</strong> IBWL. State<br />

Govt. had filed a review petition in Hon’ble Supreme Court<br />

<strong>of</strong> India for review <strong>of</strong> its order dated 19.4.04. After hearing,<br />

Hon’ble Supreme Court directed that the matter is referred<br />

to the Standing Committee <strong>of</strong> the National Board <strong>of</strong> Wildlife<br />

to consider waiving or modifying these conditions as sought<br />

by the applicant. MOEF vide letter dated 4.10.07 has<br />

informed that a Committee has been constituted to carry<br />

out site inspection before taking a final decision on the<br />

issues raised. The inspection is likely to conducted in<br />

Dec.07. S&I work for preparation <strong>of</strong> DPR has been<br />

suspended due to non-availability <strong>of</strong> site clearance stage-II<br />

by MOEF.<br />

COMMERCIAL PERFORMANCE OF THE CORPORATION<br />

During the financial year 2007-08 (up to November, 2007),<br />

96.59% realization has been achieved (Rs. 1835.67 Crore<br />

realized against the bills raised amounting to Rs. 1900.40<br />

Cr. during the FY 2007-08). The current outstanding dues<br />

as on 30 th November 2007 are Rs. 75.07 Cr. which is<br />

equivalent to 0.41 months <strong>of</strong> average billing. Also, there is<br />

no default by State Governments / beneficiaries in payment<br />

<strong>of</strong> interest on bonds and long term advances and during<br />

FY 2007-08 an amount <strong>of</strong> interest <strong>of</strong> Rs. 221.92 Crore has<br />

been earned up to October, 2007.<br />

The following activities have been taken up during the year 2007-08 and their progress up to 30th November 2007 is<br />

given below:-<br />

S. No Activity (a) Progress upto 30th Nov.2007 Anticipated progress<br />

upto 31.3.08<br />

1 Energy Audit <strong>of</strong><br />

<strong>Power</strong> Stations<br />

2 Durgaduani Mini Tidel<br />

<strong>Power</strong> Project, Sunderbans,<br />

West Bengal<br />

3. Promoting use <strong>of</strong> New &<br />

Renewable sources <strong>of</strong><br />

Energy.<br />

Field study and measurement regarding<br />

Energy Audit <strong>of</strong> Rangit and Chamera-I<br />

<strong>Power</strong> stations has been completed by<br />

CPRI, Bangalore and the draft reports<br />

for both the power stations have been<br />

received for comments/consideration.<br />

MNES has requested NHPC to explore<br />

the possibilities for implementing Tidal<br />

<strong>Power</strong> Project in West Bengal. In this<br />

regard an MOU has been signed<br />

between NHPC and WBREDA for the<br />

implementation <strong>of</strong> Durgaduani Mini Tidal<br />

<strong>Power</strong> Project, Sunderbans. In<br />

compliance with the provision <strong>of</strong> MOU,<br />

NHPC has revised the DPR in<br />

association with foreign consultant and<br />

the same was submitted to WBREDA<br />

on 5.11.07.<br />

To promote environmental friendly use<br />

<strong>of</strong> solar energy solar heating and solar<br />

lighting equipment, are being considered<br />

Final report on Energy Audit <strong>of</strong><br />

Rangit and Chamera-I power<br />

stations be expected in the<br />

month <strong>of</strong> January 2008.<br />

Target for the year 2007-08 has<br />

been achieved. Further action to<br />

be taken only after receiving go<br />

ahead for project<br />

implementation from WBREDA<br />

lmplementing the use <strong>of</strong> solar<br />

energy at Residential Colony is<br />

being under under active<br />

consideration.<br />

107