<strong>Power</strong> Hydraulique, France and M/s Alstom Projects<br />

India Ltd., New Delhi, and Hydro Mechanical works<br />

have been awarded to M/s Texmaco. The project had<br />

suffered initial delays due to delay in issue <strong>of</strong> formal<br />

forest clearance by MOEF & non-diversion <strong>of</strong> land from<br />

the State Govts. <strong>of</strong> Arunachal Pradesh and Assam.<br />

Forest clearance was accorded by MOEF on<br />

12.10.2004. The river has been diverted on 25.12.2007.<br />

The Excavation <strong>of</strong> Intake Structure, HRT and surge<br />

chamber are in progress. Due to incessant rain in the<br />

month <strong>of</strong> January, 2008, slope failure has taken place<br />

in the power house area and the project roads<br />

have also been damaged. An expenditure <strong>of</strong><br />

Rs.1819.25 crore has been incurred up to January, 2008.<br />

NTPC Projects (Thermal)<br />

A view <strong>of</strong> the dam and spilway, Doyang Hydro Electric <strong>Power</strong> Station (75MW), Nagaland<br />

(i) Bongaigaon TPS (3X250) MW by NTPC: NTPC has<br />

proposed to set up coal based Bongaigaon TPP<br />

(3x250MW) at Salkati, Kokrajhar District <strong>of</strong> Assam.<br />

A coal linkage has been accorded by the <strong>Ministry</strong> <strong>of</strong><br />

Coal. MOE&F clearance has also been received on<br />

07.06.2007. NTPC had invited bids for supply <strong>of</strong> the<br />

Main Plant Equipments and the Letter <strong>of</strong> Award (LOA)<br />

has been placed on 05.02.2008. Commissioning <strong>of</strong><br />

three (3) units is expected during the 11 th Plan i.e. in<br />

Nov, 2010, March. 2011 and July. 2011 respectively.<br />

Joint Venture Projects (Thermal)<br />

(i) Tripura Gas (750 MW) by <strong>Power</strong> Development<br />

Company, Joint Venture <strong>of</strong> ILF&FS, ONGC and<br />

Govt. <strong>of</strong> Tripura: ONGC in joint venture with IL&FS<br />

Govt. <strong>of</strong> Tripura proposes to set up (3x250 MW)<br />

combined cycle gas based power plant at Paltana in<br />

Tripura. Gas supply agreement has been signed with<br />

ONGC in April, 05. The DPR for project has been<br />

completed. MOE&F clearance has been accorded on<br />

07.02.2007. Pre- bid conference was held on<br />

15.09.2007 and the Bids were opened on 21.12.2007<br />

and are under evaluation. LOA is expected to be placed<br />

by March, 2008. The project is scheduled for<br />

commissioning during the 11th Plan.<br />

STATE SECTOR PROJECTS<br />

(i) Myntdu (2x42 MW) – Meghalaya: Myntdu HE Project<br />

(2x42 MW) is under execution by the Meghalaya<br />

State Electricity Board. The CEA accorded clearance<br />

to this project on 20.09.99 at an estimated cost <strong>of</strong><br />

Rs.391.33 crore (completion cost at 01/99 PL) with the<br />

commissioning target by 10/2006. The revised year <strong>of</strong>