44<br />

* Sadamander HEP(71 MW and Bhasmey HEP(51 MW) are not feasible during 11th Plan. However, Teesta III would<br />

achieve its full capacity <strong>of</strong> 1200 MW during 11th Plan.<br />

TWELVETH PLAN PROJECTS:<br />

40 Hydro <strong>Power</strong> projects and 4 Thermal <strong>Power</strong> Projects with an aggregate installed capacity <strong>of</strong> 25,659 MW have<br />

been tentatively identified which are likely to yield benefits during 12 th Plan as per the details given below:<br />

Sl. 12th Plan Addition<br />

No. Name <strong>of</strong> States No. <strong>of</strong> Schemes Hydro (MW) No. <strong>of</strong> Schemes Thermal (MW) Total<br />

1. Assam 2 210 1 480 690<br />

2. Manipur 2 66 – – 66<br />

3. Meghalaya 3 90 2 960 1050<br />

4. Mizoram – – – – –<br />

5. Arunachal Pradesh 18 20570 – – 20570<br />

6. Nagaland – – – – –<br />

7. Tripura – – 1 104 104<br />

Total (NER) 25 20936 4 1544 22480<br />

8. Sikkim 15 3179 – – 3179<br />

Total (NER+<br />

Sikkim)<br />

40 24115 4 1544 25659