CONTENTS SI. No. Chapter Page No.(s
- Page 8 and 9:
2 Rules under Electricity Act. 2003
- Page 10:
4 GENERATION PLF OF THERMAL STATION
- Page 13 and 14:
The Ministry of Power started funct
- Page 15 and 16:
Shri Gireesh Pradhan, Addl. Secreta
- Page 17 and 18:
GENERATION GENERATION & POWER SUPPL
- Page 19 and 20:
POWER-SUPPLY POSITION - ENERGY POWE
- Page 21 and 22:
Capacity addition programme during
- Page 23 and 24:
Electricity (Amendment) Act, 2007 T
- Page 25 and 26:
The billing efficiency at the natio
- Page 27 and 28:
S. No. Name of the line/Sub-station
- Page 29 and 30:
RURAL ELECTRIFICATION PROGRAMME Rur
- Page 31 and 32:
Energy is an important input requir
- Page 33 and 34:
Hon’ble President Smt. Pratibha D
- Page 35 and 36:
Risk mitigation measures for encour
- Page 37 and 38:
Prize Winning Painting by Aritra Sa
- Page 39 and 40:
RENOVATION AND MODERNISATION OF THE
- Page 41 and 42:
STATUS OF PRIVATE SECTOR PARTICIPAT
- Page 43 and 44:
Shri Anil Razdan, Secretary (Power)
- Page 45 and 46:
PGCIL is constructing a 220 KV tran
- Page 47 and 48:
CHAPTER - 13 POWER DEVELOPMENT ACTI
- Page 49 and 50:
commissioning of the project is 200
- Page 51 and 52:
IMPLEMENTATION OF OFFICIAL LANGUAGE
- Page 53 and 54:
Regional offices of the Corporation
- Page 55 and 56:
were awarded Certificates and Cash
- Page 57 and 58:
CHAPTER - 15 VIGILANCE ACTIVITIES/D
- Page 59 and 60:
action on Complaints, conducting in
- Page 61 and 62:
ACTIVITIES RELATING TO WOMEN EMPLOY
- Page 63 and 64:
REC The information regarding, Repr
- Page 65 and 66:
PHYSICALLY CHALLENGED EMPLOYEES MIN
- Page 67 and 68:
Employees (Recruitment and Conditio
- Page 69 and 70:
WELFARE OF SCHEDULED CASTES, SCHEDU
- Page 71 and 72:
* Backlog vacancies were shown dist
- Page 73 and 74:
NEEPCO Welfare of SC’s/ST’s/OBC
- Page 75 and 76:
1. CONSTITUTION OF CEA CENTRAL ELEC
- Page 77 and 78:
RESEARCH AND DEVELOPMENT IMPORTANT
- Page 79 and 80:
CENTRAL ELECTRICITY REGULATORY COMM
- Page 81 and 82:
Length of the right of way for comm
- Page 83 and 84:
APPELLATE TRIBUNAL FOR ELECTRICITY
- Page 85 and 86:
PUBLIC SECTOR UNDERTAKINGS 1.0 The
- Page 87 and 88:
Hon’ble Prime Minister Dr. Manmoh
- Page 89 and 90:
DETAILS OF ON-GOING AND NEW PROJECT
- Page 91 and 92:
Tendering process for infrastructur
- Page 93 and 94:
undertaking) to set up and operate
- Page 95 and 96:
A view of NTPC Gas Power Project at
- Page 97 and 98:
In spite of the marginal increase i
- Page 99 and 100:
in Mathura district of Uttar Prades
- Page 101 and 102:
ET is being set up at 75 Acres of l
- Page 103 and 104:
LIST OF NTPC COMMISSIONED STATIONS/
- Page 105 and 106:
TANAKPUR $94.2 383.45 51.66 435.11
- Page 107 and 108:
The Status of on going projects is
- Page 109 and 110:
List of projects is as under: S.No.
- Page 111 and 112:
KHANP was again discussed by the St
- Page 113 and 114:
5-6. Tawang-I & II (1500 MW), Aruna
- Page 115 and 116:
8 Ecological study of Teesta River
- Page 117 and 118:
NHPC has also commissioned 2 projec
- Page 119 and 120:
POWER GRID CORPORATION OF INDIA LTD
- Page 121 and 122:
New Delhi Municipal Council (NDMC)
- Page 123 and 124:
measures for the same have been ado
- Page 125 and 126:
sustainability and has also recogni
- Page 127 and 128:
Existing/Proposed Inter-Regional Tr
- Page 129 and 130:
POWER FINANCE CORPORATION LTD.(PFC)
- Page 131 and 132:
4.0 PERFORMANCE HIGHLIGHTS 4.1 PFC
- Page 133 and 134: 11.3ANNUAL AND QUARTERLY PERFORMANC
- Page 135 and 136: available application forms and sta
- Page 137 and 138: Conferment of Navratna status to PF
- Page 139 and 140: to enjoy “AAA” rating - the hig
- Page 141 and 142: (k) Revenue Sustainability Based on
- Page 143 and 144: providing CDM Advisory consultancy
- Page 145 and 146: Annexure-I (Page - 2) ACHIEVEMENT O
- Page 147 and 148: Annexure-III GENERATION PROJECTS SA
- Page 149 and 150: NORTH EASTERN ELECTRIC POWER CORPOR
- Page 151 and 152: MAWHU HYDRO ELECTRIC PROJECT (90 MW
- Page 153 and 154: Out of the total energy generated a
- Page 155 and 156: SJVNL, through its intense and conc
- Page 157 and 158: Project a comprehensive Satluj Basi
- Page 159 and 160: Financial Performance THDC has repo
- Page 161 and 162: REHABILITATION & RESETTLEMENT The T
- Page 163 and 164: DAMODAR VALLEY CORPORATION Damodar
- Page 165 and 166: GENERATION AND POWER SUPPLY POSITIO
- Page 167 and 168: Sl. Schemes Progress upto Target up
- Page 169 and 170: ENERGY CONSERVATION PROGRAMME DVC h
- Page 171 and 172: RECENT INITIATIVES Guideline for So
- Page 173 and 174: GENERATION AND TRANSMISSION SYSTEM
- Page 175 and 176: The Animal Husbandry Deptt. of HP h
- Page 177 and 178: BUREAU OF ENERGY EFFICIENCY The Gov
- Page 179 and 180: Prize Winning Painting by Yeerina D
- Page 181 and 182: Central Power Research Institute (C
- Page 183: CPRI became the second laboratory i
- Page 187 and 188: CHAPTER - 23 OTHER IMPORTANT ACTIVI
- Page 189 and 190: of attaining a capacity addition of
- Page 191 and 192: CHAPTER - 24 E-GOVERNANCE / IT INIT
- Page 193 and 194: Bonus Module and Tuition Fee Module
- Page 195 and 196: STATEMENT - II INSTALLED CAPACITY (
- Page 197 and 198: STATEMENT - IV INSTALLED CAPACITY (
- Page 199 and 200: STATEMENT - VI INSTALLED CAPACITY (
- Page 201 and 202: AUDIT OBSERVATIONS OF C&AG The pri