10 Preliminary study <strong>of</strong><br />
downstream release<br />
<strong>of</strong> water <strong>of</strong> hydro<br />
power projects<br />
CO-OPERATION WITH IRTCES, CHINA<br />
In India and China, with increase <strong>of</strong> frequent human<br />
activities, soil loss in the drainage basin becomes a very<br />
serious problem, and a lot <strong>of</strong> heavily-laden rivers such as<br />
the Yellow River and the Yongding River etc., have been<br />
formed. The characteristics <strong>of</strong> incoming water and sediment<br />
<strong>of</strong> these heavily-laden rivers are their annual run<strong>of</strong>f with<br />
large annual sediment load, and this kind <strong>of</strong> imbalance<br />
between water flow and sediment load not only leads to<br />
substantial deposition in the river channel, but poses a big<br />
negative impact on the hydraulic-projects on the rivers,<br />
causing serious deposition and reservoir storage loss, which<br />
directly influence the benefits <strong>of</strong> reservoirs. Therefore, a<br />
large amount <strong>of</strong> research works on reservoir sedimentation<br />
management have been carried out in china.<br />
The reservoir deposition and storage loss is an important<br />
issue NHPC must face up with, and it is also one <strong>of</strong> the key<br />
technologies needed to be considered and solved by NHPC.<br />
Whereas, IRTCES has interest in research and training to<br />
solve scientific and engineering problems related to erosion<br />
and sedimentation. IRTCES welcomes future cooperation<br />
and collaboration with organisations all over the world to<br />
promote the international development on erosion and<br />
sedimentation, engineering problems related to erosion and<br />
sedimentation.<br />
An MOU has been signed on the 28, November, 2006<br />
between NHPC and IRTCES for cooperation on various<br />
research areas. A research project on sedimentation<br />
management <strong>of</strong> reservoirs on heavily-laden sediment rivers<br />
was proposed for further cooperation.<br />
On 20.09.2007 representatives <strong>of</strong> IRTCES, China visited<br />
NHPC and a meeting was held with NHPC in the Office<br />
Complex, Faridabad, for detailed discussion on<br />
collaborative research on management <strong>of</strong> sedimentation<br />
in reservoir as per MOU. The methodology, terms &<br />
conditions <strong>of</strong> the research cooperation are being finalized.<br />
CONSULTANCY SERVICE<br />
NHPC is providing consultancy services in the various fields<br />
<strong>of</strong> hydro power viz. river basin studies, survey works, design<br />
and engineering, geological studies, geotechnical studies,<br />
hydraulic transients studies, hydrological studies, contract<br />
management, construction management, equipment<br />
planning, underground construction, testing, commissioning,<br />
operation & maintenance etc. to leading organizations <strong>of</strong> the<br />
Preliminary study <strong>of</strong> down stream<br />
release <strong>of</strong> water <strong>of</strong> hydro power projects<br />
has been taken up as a research<br />
project. Report <strong>of</strong> preliminary study <strong>of</strong><br />
D/S release <strong>of</strong> water <strong>of</strong> hydro projects<br />
has been prepared.<br />
Target for the year 2007-08 has<br />
been achieved and detailed<br />
study is being planed for the<br />
year 2008-09.<br />
country like A&N Administration, BBMB, BHPC, CEA, CSEB,<br />
CWC, DVC, Govt. <strong>of</strong> Arunachal Pradesh, Govt. <strong>of</strong> Bihar,<br />
Govt. <strong>of</strong> Goa, Govt. <strong>of</strong> Mizoram, Govt. <strong>of</strong> Nagaland, JKPDC,<br />
KPA, KRCL, KSEB, LAHDC, MEA, NHDC, Northern<br />
Railways, NTPC, PIDB, PGCIL, REC, SJVNL, THDC, THPA,<br />
UJVNL, J&KPDD, WBPDCL and various private<br />
organizations like CES, ICICI, IFCI, Jaiprakash Hydro <strong>Power</strong><br />
Ltd. & Athena Demwe <strong>Power</strong> Pvt. Ltd.<br />
NHPC is registered with World Bank, Asian Development<br />
Bank, African Development Bank and Kuwait Fund for Arab<br />
Economic Development, Central Water Commission and<br />
Consultancy Development Centre as a Consultant.<br />
NHPC has signed MOU with Montgomery Watson Harza<br />
Americas Inc., International Energy & Water Resources<br />
Group, USA for providing consultancy & management<br />
services jointly in the field <strong>of</strong> hydro power in India and<br />
abroad.<br />
CO-OPERATION WITH NEIGHBOURING COUNTRIES IN<br />
HYDRO POWER<br />
MANGDECHHU HE PROJECT (672 MW), BHUTAN<br />
NHPC has undertaken the work <strong>of</strong> preparation <strong>of</strong><br />
Detailed Project Report (DPR) for Mangdechhu H. E.<br />
Project at a cost <strong>of</strong> Rs.7.59 Crores under the Govt. <strong>of</strong><br />
India project tied assistance to Bhutan. Subsequent<br />
to signing <strong>of</strong> the implementation agreement between<br />
Department <strong>of</strong> Energy (DoE), <strong>Ministry</strong> <strong>of</strong> Trade &<br />
Industry, Royal Government <strong>of</strong> Bhutan (RGoB) and<br />
NHPC on 29.9.2006, NHPC carried out survey &<br />
investigation works at the project and same is nearing<br />
completion. Preparation and submission <strong>of</strong> DPR to<br />
RGoB is expected to be made by Feb 2008.<br />
VARZOB HYDRO POWER PLANT – I (2X3.67 MW),<br />
TAJIKISTAN<br />
Govt. <strong>of</strong> India decided to undertake the rehabilitation<br />
<strong>of</strong> the Varzob – I hydropower station in Tajikistan on<br />
the lines <strong>of</strong> the feasibility report jointly prepared by<br />
NHPC & BHEL team in Sep’06. A tripartite agreement<br />
for Renovation, Modernization and Uprating <strong>of</strong> Varzob<br />
Hydro <strong>Power</strong> Plant – I (2X3.67 MW) has been signed<br />
between Barki Tojik, Tajikistan and NHPC and BHEL<br />
on 7 th December 2006. The MOU proposed to be<br />
signed between MEA, NHPC and BHEL is under<br />
process by MEA.