04.08.2013 Views

MoP - Ministry of Power

MoP - Ministry of Power

MoP - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

110<br />

10 Preliminary study <strong>of</strong><br />

downstream release<br />

<strong>of</strong> water <strong>of</strong> hydro<br />

power projects<br />

CO-OPERATION WITH IRTCES, CHINA<br />

In India and China, with increase <strong>of</strong> frequent human<br />

activities, soil loss in the drainage basin becomes a very<br />

serious problem, and a lot <strong>of</strong> heavily-laden rivers such as<br />

the Yellow River and the Yongding River etc., have been<br />

formed. The characteristics <strong>of</strong> incoming water and sediment<br />

<strong>of</strong> these heavily-laden rivers are their annual run<strong>of</strong>f with<br />

large annual sediment load, and this kind <strong>of</strong> imbalance<br />

between water flow and sediment load not only leads to<br />

substantial deposition in the river channel, but poses a big<br />

negative impact on the hydraulic-projects on the rivers,<br />

causing serious deposition and reservoir storage loss, which<br />

directly influence the benefits <strong>of</strong> reservoirs. Therefore, a<br />

large amount <strong>of</strong> research works on reservoir sedimentation<br />

management have been carried out in china.<br />

The reservoir deposition and storage loss is an important<br />

issue NHPC must face up with, and it is also one <strong>of</strong> the key<br />

technologies needed to be considered and solved by NHPC.<br />

Whereas, IRTCES has interest in research and training to<br />

solve scientific and engineering problems related to erosion<br />

and sedimentation. IRTCES welcomes future cooperation<br />

and collaboration with organisations all over the world to<br />

promote the international development on erosion and<br />

sedimentation, engineering problems related to erosion and<br />

sedimentation.<br />

An MOU has been signed on the 28, November, 2006<br />

between NHPC and IRTCES for cooperation on various<br />

research areas. A research project on sedimentation<br />

management <strong>of</strong> reservoirs on heavily-laden sediment rivers<br />

was proposed for further cooperation.<br />

On 20.09.2007 representatives <strong>of</strong> IRTCES, China visited<br />

NHPC and a meeting was held with NHPC in the Office<br />

Complex, Faridabad, for detailed discussion on<br />

collaborative research on management <strong>of</strong> sedimentation<br />

in reservoir as per MOU. The methodology, terms &<br />

conditions <strong>of</strong> the research cooperation are being finalized.<br />

CONSULTANCY SERVICE<br />

NHPC is providing consultancy services in the various fields<br />

<strong>of</strong> hydro power viz. river basin studies, survey works, design<br />

and engineering, geological studies, geotechnical studies,<br />

hydraulic transients studies, hydrological studies, contract<br />

management, construction management, equipment<br />

planning, underground construction, testing, commissioning,<br />

operation & maintenance etc. to leading organizations <strong>of</strong> the<br />

Preliminary study <strong>of</strong> down stream<br />

release <strong>of</strong> water <strong>of</strong> hydro power projects<br />

has been taken up as a research<br />

project. Report <strong>of</strong> preliminary study <strong>of</strong><br />

D/S release <strong>of</strong> water <strong>of</strong> hydro projects<br />

has been prepared.<br />

Target for the year 2007-08 has<br />

been achieved and detailed<br />

study is being planed for the<br />

year 2008-09.<br />

country like A&N Administration, BBMB, BHPC, CEA, CSEB,<br />

CWC, DVC, Govt. <strong>of</strong> Arunachal Pradesh, Govt. <strong>of</strong> Bihar,<br />

Govt. <strong>of</strong> Goa, Govt. <strong>of</strong> Mizoram, Govt. <strong>of</strong> Nagaland, JKPDC,<br />

KPA, KRCL, KSEB, LAHDC, MEA, NHDC, Northern<br />

Railways, NTPC, PIDB, PGCIL, REC, SJVNL, THDC, THPA,<br />

UJVNL, J&KPDD, WBPDCL and various private<br />

organizations like CES, ICICI, IFCI, Jaiprakash Hydro <strong>Power</strong><br />

Ltd. & Athena Demwe <strong>Power</strong> Pvt. Ltd.<br />

NHPC is registered with World Bank, Asian Development<br />

Bank, African Development Bank and Kuwait Fund for Arab<br />

Economic Development, Central Water Commission and<br />

Consultancy Development Centre as a Consultant.<br />

NHPC has signed MOU with Montgomery Watson Harza<br />

Americas Inc., International Energy & Water Resources<br />

Group, USA for providing consultancy & management<br />

services jointly in the field <strong>of</strong> hydro power in India and<br />

abroad.<br />

CO-OPERATION WITH NEIGHBOURING COUNTRIES IN<br />

HYDRO POWER<br />

MANGDECHHU HE PROJECT (672 MW), BHUTAN<br />

NHPC has undertaken the work <strong>of</strong> preparation <strong>of</strong><br />

Detailed Project Report (DPR) for Mangdechhu H. E.<br />

Project at a cost <strong>of</strong> Rs.7.59 Crores under the Govt. <strong>of</strong><br />

India project tied assistance to Bhutan. Subsequent<br />

to signing <strong>of</strong> the implementation agreement between<br />

Department <strong>of</strong> Energy (DoE), <strong>Ministry</strong> <strong>of</strong> Trade &<br />

Industry, Royal Government <strong>of</strong> Bhutan (RGoB) and<br />

NHPC on 29.9.2006, NHPC carried out survey &<br />

investigation works at the project and same is nearing<br />

completion. Preparation and submission <strong>of</strong> DPR to<br />

RGoB is expected to be made by Feb 2008.<br />

VARZOB HYDRO POWER PLANT – I (2X3.67 MW),<br />

TAJIKISTAN<br />

Govt. <strong>of</strong> India decided to undertake the rehabilitation<br />

<strong>of</strong> the Varzob – I hydropower station in Tajikistan on<br />

the lines <strong>of</strong> the feasibility report jointly prepared by<br />

NHPC & BHEL team in Sep’06. A tripartite agreement<br />

for Renovation, Modernization and Uprating <strong>of</strong> Varzob<br />

Hydro <strong>Power</strong> Plant – I (2X3.67 MW) has been signed<br />

between Barki Tojik, Tajikistan and NHPC and BHEL<br />

on 7 th December 2006. The MOU proposed to be<br />

signed between MEA, NHPC and BHEL is under<br />

process by MEA.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!