Capital Overhauling and doing essential R&M. In the third<br />
phase, the major Renovation & Modernization (R&M) / Life<br />
Extension (LE) works based on Residual Life Assessment<br />
(RLA) studies would be taken up, if found technoeconomically<br />
viable.<br />
The programme has started showing results at a<br />
number <strong>of</strong> power stations in the form <strong>of</strong> improvement<br />
in PLF, availability, specific oil consumption and<br />
auxiliary power consumption. There was an overall<br />
increase in PLF from 43.3 % to 48.5 % during the<br />
year 2006-07 as compared to the previous year i.e.<br />
2005-06 from the stations under PIE programme. During<br />
the current financial year up to Jan’ 08 there is increase in<br />
generation <strong>of</strong> 544 MU over the corresponding period <strong>of</strong><br />
previous year.<br />
A view <strong>of</strong> Thermal Turbine under maintainance<br />
Programme for the year 2007-08<br />
During the year 2007-08, LE work on unit No. 2 (1x40MW)<br />
<strong>of</strong> Obra TPS have already been completed and the execution<br />
<strong>of</strong> LE works on another 14 thermal unit (1834 MW) are in<br />
progress. Order for LE works as another 13 units (1700<br />
MW) have been placed and works on these units a likely to<br />
be started shortly.<br />
Further with a view to study the feasibility <strong>of</strong> incorporating<br />
efficiency improvement component in the R&M/ LE<br />
programme, few thermal power units (<strong>of</strong> 200/210 MW) have<br />
been identified. Suitable consultants would be selected to<br />
carry out the studies requires for efficiency improvement<br />
through R&M. On the basis <strong>of</strong> these studies the R&M/LE<br />