04.08.2013 Views

MoP - Ministry of Power

MoP - Ministry of Power

MoP - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

86<br />

(C) Strategic Alliances :<br />

As a part <strong>of</strong> developing strategic alliances as well as deriving<br />

technical strengths, NTPC has entered into MOUs with :<br />

Coal India Ltd. (CIL) with an intent to acquire/ identify and<br />

carry out O&M <strong>of</strong> coal blocks and integrated power project(s)<br />

in India. A Joint Business Development Group has been<br />

constituted. JV Agreement between NTPC and CIL is under<br />

finalization.<br />

Singareni Collieries Co. Ltd. (SCCL) to take up coal mining<br />

in India and abroad. “NTPC-SCCL Global Ventures Pvt.<br />

Ltd.”. a JV company has been formed with SCCL on<br />

18.06.2007.<br />

Bharat Earth Movers Ltd. (BEML) to maximize/ optimize<br />

coal production through deployment <strong>of</strong> fleet <strong>of</strong> equipment<br />

required for mining with the object to minimize the cost <strong>of</strong><br />

coal. A Joint Working Group was formed on 11.04.2007.<br />

SAIL, RINL, CIL, NMDC & NTPC for acquiring Coal Blocks<br />

(Coking Coal & Thermal Coal) outside India. CCEA has<br />

already approved the formation <strong>of</strong> a Special Purpose Vehicle<br />

(SPV) for the purpose.<br />

7.4 Joint Ventures<br />

7.4.1NTPC-SAIL <strong>Power</strong> Company Private Limited<br />

NTPC-SAIL <strong>Power</strong> Company Private Limited (NSPCL), a<br />

Joint Venture <strong>of</strong> NTPC and SAIL on 50:50 basis,<br />

incorporated on 16.03.2001. BESCL (Bhilai Electric Supply<br />

Company Pvt. Ltd.), another joint venture company<br />

incorporated in March 2002 was merged with it w.e.f.<br />

02.08.2006. The company owns, operates and maintains<br />

Captive <strong>Power</strong> Plants (CPP-II) <strong>of</strong> 74 MW located at Bhilai<br />

Steel Plant, 120 MW at Durgapur Steel Plant and 120 MW<br />

at Rourkela Steel Plant. Total installed capacity <strong>of</strong> NSPCL<br />

is 314 MW.<br />

These plants are supplying power to the respective steel<br />

plants on captive basis. During the year 2006-07, NSPCL<br />

achieved record generation <strong>of</strong> 2503.43 Million Units as<br />

against the last year’s generation <strong>of</strong> 2454.12 Million units<br />

registering an increase <strong>of</strong> 2.01%. NSPCL is also<br />

implementing (2x250 MW) Bhilai Expansion <strong>Power</strong> Project<br />

primarily for meeting captive power requirement <strong>of</strong> Bhilai<br />

Steel Plant and other units <strong>of</strong> SAIL.<br />

Total Income (excluding coal cost) <strong>of</strong> NSPCL during 2006-<br />

07 was Rs 200.9 Crores. Pr<strong>of</strong>it (after tax) <strong>of</strong> the company<br />

for the year 2006-07 was Rs 39.0 Crores.<br />

7.4.2 NTPC Alstom <strong>Power</strong> Services Limited<br />

NTPC Alstom <strong>Power</strong> Services Limited (NASL) is a 50:50<br />

joint venture between NTPC and Alstom <strong>Power</strong> Generation<br />

AG, which was incorporated on 27.09.1999 for taking up<br />

Renovation & Modernisation (R&M) assignments <strong>of</strong> power<br />

plants in India and abroad. NASL is engaged in undertaking<br />

works <strong>of</strong> Renovation & Modernization <strong>of</strong> <strong>Power</strong> Plants in<br />

India for plant life extension, performance optimization and<br />

improvement <strong>of</strong> availability & efficiency. Turnover <strong>of</strong> the<br />

company for the year 2006-07 was Rs. 46.5 crores and pr<strong>of</strong>it<br />

after tax was Rs. 3.0 crores.<br />

7.4.3 Utility <strong>Power</strong>tech Limited<br />

Utility <strong>Power</strong>tech Limited (UPL) (a 50:50 Joint Venture<br />

Company <strong>of</strong> NTPC and Reliance Energy), incorporated on<br />

23.11.1995 to take up assignments <strong>of</strong> construction, erection<br />

and project management in power and other sectors in India<br />

and abroad is progressing satisfactorily. Pr<strong>of</strong>it after tax <strong>of</strong><br />

the JVC for the year 2006-07 was Rs. 9.3 crores and the<br />

turnover was Rs. 180.9 crores.<br />

7.4.4 PTC India Ltd<br />

Joint Venture company formed on 23.05.2003 for trading <strong>of</strong><br />

power, has 8% equity contribution each from NTPC, <strong>Power</strong><br />

Grid Corporation <strong>of</strong> India Ltd., <strong>Power</strong> Finance Corporation<br />

and NHPC and the balance from Damodar Valley<br />

Corporation, Financial institutions, Banks and general public.<br />

Turnover <strong>of</strong> the company for the year 2006-07 was Rs.<br />

3785.9 crores and pr<strong>of</strong>it after tax was Rs. 35.2 crores.<br />

7.4.5 NTPC Tamil Nadu Energy Company Limited<br />

(NTECL)<br />

NTPC and TNEB have formed a 50:50 Joint Venture<br />

Company under the name <strong>of</strong> NTPC Tamil Nadu Energy<br />

Company Limited (NTECL). The company was incorporated<br />

on 23.05.2003 to set up a coal based power station <strong>of</strong> 1000<br />

MW capacity. NTECL has undertaken to set up a 2x500<br />

MW power project at Ennore, in the State <strong>of</strong> Tamil Nadu<br />

since named as Vallur Thermal <strong>Power</strong> Project. All the key<br />

inputs and necessary clearance have been tied-up/ obtained<br />

for the project and the project is under implementation.<br />

Second phase <strong>of</strong> 1x500 MW has also been planned. Both<br />

the phases are targeted for commissioning in 11th plan.<br />

7.4.6 Ratnagiri Gas and <strong>Power</strong> Private Limited (RGPPL)<br />

Ratnagiri Gas and <strong>Power</strong> Supply Pvt Ltd has been formed<br />

on 08.07.2005 as a joint venture company between NTPC,<br />

GAIL, Maharashtra State Electricity Board and Indian<br />

Financial institutions with NTPC having a stake <strong>of</strong> 28.33%<br />

for taking over and operating Dabhol <strong>Power</strong> Project. NTPC<br />

has invested Rs 500 Cr as 28.33% equity. Generation has<br />

already started from 1480 MW (two <strong>of</strong> the three blocks), out<br />

<strong>of</strong> the total capacity <strong>of</strong> 2140 MW.<br />

7.4.7 Aravali <strong>Power</strong> Company Private Limited (APCPL)<br />

Aravali <strong>Power</strong> Company Private Limited has been formed<br />

on 21.12.2006 as a 50:25:25 joint venture company between<br />

NTPC, HPGCL (Haryana <strong>Power</strong> Generation Corporation<br />

Ltd., a Govt. <strong>of</strong> Haryana undertaking) and IPGCL (Indra<br />

Prastha <strong>Power</strong> Generation Company, Govt. <strong>of</strong> NCT <strong>of</strong> Delhi

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!