Tendering process for infrastructures like Coal<br />

Handling Plant, Railway Siding, Main Sub-Station, etc.<br />

are under progress.<br />

NTPC’s application for Stage-II Environment clearance<br />

was discussed in the Expert Committee meeting <strong>of</strong><br />

MOEF on 29.08.2007.<br />

NTPC is going ahead with appointment <strong>of</strong> a Mine<br />

Developer-cum-Operator (MDO) through competitive<br />

bidding process.<br />

For obtaining <strong>of</strong> Forest Clearance, NTPC is pursuing<br />

with Hazaribagh Distt. Admn. for issuance <strong>of</strong><br />

No-Objection Clearance on jungle-jhari land, as a<br />

pre-requisite for Forest Clearance. Physical verification<br />

<strong>of</strong> such land is under progress by them.<br />

For coal evacuation from this mine, NTPC requires<br />

KODERMA-HAZARIBAGH-BANADAG Railway Link,<br />

taken up by Railways, to be completed in time.<br />

Brief Status <strong>of</strong> Activities in Other Coal Mine Blocks :<br />

The Talaipalli Coal Block, allotted to NTPC by <strong>Ministry</strong><br />

<strong>of</strong> Coal, was only regionally explored whereas Dulanga<br />

block was partly explored. Accordingly, NTPC engaged<br />

M/s MECL for undertaking detailed exploration &<br />

preparation <strong>of</strong> Geological Report (GR) for these blocks.<br />

Exploration has been completed in Dulanga and draft<br />

GR has been received on 29.09.2007. In Talaipalli,<br />

exploration is under progress. Around 33717 m <strong>of</strong><br />

drilling is already completed.<br />

NTPC has already initiated action for land acquisition<br />

in these blocks. For acquisition <strong>of</strong> land for mining,<br />

Notification under Section 4(i) <strong>of</strong> CBA Act has been<br />

published for these coal blocks as under :<br />

Chatti-Bariatu & Talaipalli : on 22.08.2007<br />

Kerandari : on 26.08.2007<br />

Dulanga : on 18.10.2007<br />

Application for Notification under Section 7(i) for<br />

Chatti-Bariatu Block has been submitted on<br />

19.10.2007. For other blocks, it is under preparation.<br />

Feasibility Study for coal transportation and Railway<br />

siding system have been conducted in these coal<br />

blocks and finalization <strong>of</strong> routes are under progress.<br />

Socio-Economic Survey has been completed in Chatti-<br />

Bariatu, Kerandari and Dulanga coal blocks and reports<br />

have been received. It is in progress in Talaipalli<br />

coal block.<br />

NTPC has submitted Mine Plan for Chatti-Bariatu<br />

(7 MTPA) and Kerandari (6 MTPA) coal blocks to MOC<br />

on 06.11.2007 and 27.11.2007 respectively,<br />

for approval.<br />

Smt. Sonia Gandhi, Chairperson, UPA inspecting a model <strong>of</strong> the proposed 1500 MW<br />

Indira Gandhi Super Thermal <strong>Power</strong> Project at Jhajjar (Haryana) in October, 2007<br />

85