70<br />
4. Kotlibhel Stage-I A HEP 3x65=195 US$ 4.604 Million 03.10.2006<br />
Uttaranchal +Rs. 1074.87 Crs.<br />
M/s NHPC (12/05 Price Level)<br />
(ER : 1US$=Rs. 45.40)<br />
5. Pakal Dul, HEP 4x250=1000 US$ 14.98 Million 03.10.2006<br />
J&K +Rs. 5024.15 Crs.<br />
M/s NHPC (07/05 Price Level)<br />
(ER: 1 US$=Rs. 43.20)<br />
6. Kotlibhel Stage-1B, HEP 4x80=320 US$ 5.371Million+ 31.10.06<br />
Uttaranchal (Rs.1782.05 Crs.)<br />
M/s NHPC (12/05 Price Level)<br />
7. Loktak Downstream 2x33=66 Rs. 867.77 Crs. 15.11.06<br />
Manipur (Price Level Oct. 06)<br />
M/s NHPC<br />
8. Kotlibhel Stage-II HEP 8x66.25=530 US$ 11.51Million+ 30.11.06<br />
Uttaranchal Rs.2484.87 Crs.<br />
M/s NHPC (ER : Rs. 44.30/US$)<br />
(Price Level Mar..06)<br />
9. Teesta Stage-VI H.E. Project 4x125=500 Rs. 3283.08 Crs. 27.12.2006<br />
Sikkim<br />
M/s Lanco Energy Pvt. Ltd.<br />
10. Pala Maneri HEP by 4x120=480 Rs.1922.80 Crs. 23.2.07<br />
M/s UJVNL in Uttaranchal. (At Dec.06 PL)<br />
Total 10 Nos. 4855 MW<br />
Details <strong>of</strong> Hydro Schemes Appraised by CEA during 2007-08 (upto 30.11.07.)<br />
Sl. Name <strong>of</strong> Scheme/State/ Installed Estimated Cost Date <strong>of</strong> CEA<br />
No. Executing Agency Capacity (MW) (Rs. Crores) Clearance<br />
1. Rangit Stage-IV HEP by 3x40=120 Rs.726.16 6.7.07<br />
M/s Jal <strong>Power</strong> Corpn. Ltd. (completed cost)<br />
Sikkim<br />
2. Lower Jurala HEP by in 6x40=240 Rs.909.34 Crs. 24.7.07<br />
M/s APGENCO Ltd. (At May 2007 PL)<br />
Andhra Pradesh<br />
3. Pare HEP 2x55=110 Rs.553.25 Crs. 24.9.07<br />
M/s NEEPCO Ltd. (June 2007 PL)<br />
in Arunachal Pradesh<br />
Total 3 Nos. 470 MW<br />
Details <strong>of</strong> Hydro Schemes expected to be cleared techno-economically by CEA during remaining period <strong>of</strong><br />
2007-08 (upto 31 st March.08.)<br />
Sl. Name <strong>of</strong> Scheme / State / Installed Capacity Estimated cost<br />
No. Executing Agency (MW) (Rs. Crores)<br />
1. Gundia HEP by 2x200=400 MW 1059.90 Crs.<br />
M/s KPCL in Karnataka<br />
2. Kundah Pumped Storage 4x125=500 1220 Crs.<br />
HEP by TNEB in Tamil Nadu